65
UNIT CHECK LIST
UNIT CHECK LIST
Visually inspect the unit for transit and handling damage. File claim
with delivery carrier.
Install the unit as outlined in the Thermo King Installation Manual.
If the unit has a separate fuel tank add 10 gallons of fuel to the tank.
BEFORE STARTING THE UNIT
Check battery and battery cable installation.
Inspect fuel line routing checking for rubbing, chaffing or laying on
hot surfaces.
Visually inspect the unit for the following: Loose or improperly
fitting bolts, brackets, hardware, hose connections and hose routing.
Inspect all wiring connections and routing.
Check defrost drain hoses and kazoos.
Check unit mounting hardware for tightness.
Check compressor and engine mounts.
Check compressor clutch if equipped.
Install refrigeration gauge manifold. (Multi-Temp units only)
Check engine oil level.
Check condenser and evaporator section for cleanliness and signs of
refrigerant leaks.
Check front bulkhead and air chute if equipped.
Check damper door, bushings and springs.
MULTI-TEMP UNITS (REMOTE EVAPORATORS)
Check evaporator(s) sections for cleanliness.
Leak test interconnecting tubing.
Check for damage, loose or missing bolts and hardware on remote
evaporator(s).
Check for proper installation of drain tubes, drain kazoos and drain
tube heater wires.
Check for properly routed refrigerant lines wiring harnesses for
remote evaporator(s). Check for properly routed harnesses for remote
controller.
Check for proper installation of remote evaporator guards if
equipped.
Check remote harness wiring plugs in the host evaporator.
Check wiring, connections, and terminals in the remote
evaporator(s).
Check compartment bulk head(s) for proper fit if equipped.
START AND RUN UNIT
(ON MULTI-TEMP UNITS START ONLY THE HOST UNIT)
Check for proper oil pressure, coolant temperature, oil, fuel, or
coolant leaks.
Check alternator charge.
Cycle the unit and ensure the unit functions in the correct modes and
the mode indicators are working.
Set for continuous run with thermostat set point at 32 F (0 C) and run
the unit to 32 F (0 C).
Summary of Contents for T-1000M
Page 2: ......
Page 5: ...3 Installation Manual for T Series Systems ...
Page 12: ...10 Service Area T 580R T 600R T 680R T 680R T 680S T 800M T 800R T 880R T 880S ...
Page 13: ...11 Service Area T 1000M T 1000R T 1080R T 1080S and T 1200R ...
Page 14: ...12 Remote Power Receptacle Dimensions OPTION NORTH AMERICAN MODELS INTERNATIONAL MODELS ...
Page 15: ...13 Battery Box Dimensions OPTION ...
Page 16: ...14 Remote Status Light Dimensions OPTION ...
Page 17: ...15 HMI Controller Dimensions HMI Controller LED Display HMI Controller Graphics Display ...
Page 25: ...23 Required Tools ...
Page 27: ...25 Installation Components ...
Page 29: ...27 Uncrating the Unit ...
Page 31: ...29 Installing the Unit ...
Page 33: ...31 Installing the Hose Management Caps Cutout Guide Marks Front of Unit ...
Page 35: ...33 Installing the Hose Management System OPTION Front of Unit ...
Page 39: ...37 Securing the Evaporator Drain Hoses ...
Page 41: ...39 Installing the Fuel Pickup Tube Into a Steel or Aluminum Tank ...
Page 43: ...41 Installing the Fuel Pickup Tube Into a Plastic Tank ...
Page 45: ...43 Installing the Steel Fuel Tank 1 2 3 4 ...
Page 47: ...45 Installing the Aluminum Fuel Tank OPTION 1 2 3 4 ...
Page 49: ...47 Installing the Fuel Pump and Fuel Lines ...
Page 51: ...49 Installing the ServiceWatch Remote Download Port ...
Page 53: ...51 Installing the Remote Power Receptacle OPTION ...
Page 55: ...53 Installing the Remote Status Light OPTION ...
Page 59: ...57 Installing the Battery Box OPTION ...
Page 61: ...59 Battery Connections ...
Page 69: ...67 ...
Page 70: ......