![background image](http://html1.mh-extra.com/html/thermo-king/t-1000m/t-1000m_installation-manual_1104335060.webp)
58
Battery Connections
Important Battery Information
IMPORTANT: See Safety Precautions - “Battery Installation and Cable
Routing” on page 7 for additional information.
NOTE: Thermo King units are designed for one 12 volt, group 31
battery. The battery must be suitable for deep cycling, heavy duty
and rated with a minimum of 95 amp/hr.
Positive Cable
1. At the unit, locate the large black cable marked POS+. Route this cable
to the battery, cut to the proper length and add battery cable lug from
installation kit (Detail A). This cable will be attached to the battery in
Step 2.
Unit Control Power Wire
2. At the unit, locate the large 8 AWG (#2) wire. Route this wire to the
battery, cut to the proper length and add fuse holder assembly.
•
Use battery cable crimper to securely crimp 8 AWG (#2) wire and
fuse holder together and heat shrink the connection.
•
Apply a liberal amount of Superlube to the 60 amp fuse and fuse
holder and then install fuse.
•
Route the fuse holder terminal along with the positive cable
(POS+) into the battery box through the rubber grommet and
connect to the POSITIVE terminal of the battery (Detail A).
Fuel Pump Harness
3. Route and connect the fuel pump harness to the fuel pump.
Negative Cable
4. At the unit, locate the large black cable marked NEG -. Route this cable
to the battery, cut to the proper length and add the battery lug from
installation kit.
•
Route the negative cable (NEG -) into the battery box through the
rubber grommet and connect to the NEGATIVE terminal of battery
(Detail B).
5. Install the battery box cover securely.
6. All harnesses and battery cables should be neatly routed and secured
with provided clamps.
Summary of Contents for T-1000M
Page 2: ......
Page 5: ...3 Installation Manual for T Series Systems ...
Page 12: ...10 Service Area T 580R T 600R T 680R T 680R T 680S T 800M T 800R T 880R T 880S ...
Page 13: ...11 Service Area T 1000M T 1000R T 1080R T 1080S and T 1200R ...
Page 14: ...12 Remote Power Receptacle Dimensions OPTION NORTH AMERICAN MODELS INTERNATIONAL MODELS ...
Page 15: ...13 Battery Box Dimensions OPTION ...
Page 16: ...14 Remote Status Light Dimensions OPTION ...
Page 17: ...15 HMI Controller Dimensions HMI Controller LED Display HMI Controller Graphics Display ...
Page 25: ...23 Required Tools ...
Page 27: ...25 Installation Components ...
Page 29: ...27 Uncrating the Unit ...
Page 31: ...29 Installing the Unit ...
Page 33: ...31 Installing the Hose Management Caps Cutout Guide Marks Front of Unit ...
Page 35: ...33 Installing the Hose Management System OPTION Front of Unit ...
Page 39: ...37 Securing the Evaporator Drain Hoses ...
Page 41: ...39 Installing the Fuel Pickup Tube Into a Steel or Aluminum Tank ...
Page 43: ...41 Installing the Fuel Pickup Tube Into a Plastic Tank ...
Page 45: ...43 Installing the Steel Fuel Tank 1 2 3 4 ...
Page 47: ...45 Installing the Aluminum Fuel Tank OPTION 1 2 3 4 ...
Page 49: ...47 Installing the Fuel Pump and Fuel Lines ...
Page 51: ...49 Installing the ServiceWatch Remote Download Port ...
Page 53: ...51 Installing the Remote Power Receptacle OPTION ...
Page 55: ...53 Installing the Remote Status Light OPTION ...
Page 59: ...57 Installing the Battery Box OPTION ...
Page 61: ...59 Battery Connections ...
Page 69: ...67 ...
Page 70: ......