12
CARE AND MAINTENANCE
11. Damper Door
The damper door in the evaporator air outlet
must move freely with no sticking or binding.
12. Defrost Drains
Check the defrost drain hoses and fittings to
ensure they are open.
13. Trailer Doors
Ensure doors and weather seals are in good
condition, doors latch securely and weather
seals fit tightly.
14. Remote Evaporators (SLXe
SPECTRUM)
• Visually inspect Evaporator(s) for damaged,
loose, or broken parts.
• Check also for refrigerant leaks.
• Check Defrost initiation and termination
(including defrost timer) by activating/
initiating a manual defrost.
15. HSLO Module
For SLXe-300 Whisper Pro Units Only.
• Check that the module is turned on and
communicating.
• It’s a good idea to check at some stage
throughout your journey if the SR-3 unit
automatically switches to “High Speed Lock
Out” in an area designated for this - i.e. PIEK
assigned Zone.
LOADING
GENERAL INFORMATION
1. Inspect the trailer for proper insulation.
2. Ensure all door seals are tightly sealed with
no air leakage.
3. Inspect the trailer inside and out for damaged
or loose doors or skin.
4. On the inside, look for damaged walls or
floor, air ducts and clogged defrost drain
tubes.
5. Pre-cool the trailer as to desired setpoint.
6. Ensure loads are at correct carrying
temperature when you pick them up. Note
any variance.
7. Supervise loading of the product to assure
sufficient air space around and through the
load so as not to restrict air flow.
INSPECTING THE LOAD
Always inspect load prior to departure.
1. Ensure unit is off before opening the trailer
doors. Otherwise refrigerated air is expelled
hot air drawn in. The unit may be run with
the doors open if the trailer is properly
backed into a refrigerated warehouse.
2. Perform final external and internal load
temperature checks. Note any irregularities
on the manifest.
3. Ensure cargo is not blocking the evaporator
inlets and outlets and that ample circulation
space has been provided around the load.
4. Ensure trailer doors are securely locked.
5. Ensure controller setpoint is at the desired
temperature.
6. If the unit was stopped, restart using the
starting procedures outlined in this manual.
7. Repeat the After Start Inspection.
8. Defrost the unit one half-hour after loading
by selecting the Manual Defrost. The Defrost
cycle terminates automatically.
Summary of Contents for SLXe SPECTRUM
Page 2: ...ii...
Page 4: ......
Page 24: ......
Page 46: ...44 AUTOCOLLANTS DE S CURIT ET NUM ROS DE S RIE...
Page 48: ......
Page 72: ......
Page 94: ...92 SICHERHEITSAUFKLEBER UND SERIENNUMMERN...
Page 96: ......
Page 118: ...116 ADHESIVOS DE SEGURIDAD Y N MEROS DE SERIE...
Page 120: ......
Page 142: ...140 PLAKIETKI OSTRZEGAWCZE I NUMERY SERYJNE...
Page 144: ......
Page 166: ...164 VEILIGHEIDSAANDUIDINGEN EN SERIENUMMERS...
Page 168: ......
Page 188: ...186 G VENL K IKARTMALARI VE SER NUMARALARI...
Page 190: ......
Page 212: ...210 AUTOCOLANTES DE SEGURAN A E N MEROS DE S RIE...
Page 214: ......
Page 234: ...232 SIKKERHEDSSKILTE OG SERIENUMRE...
Page 236: ......
Page 256: ......
Page 259: ...257 Thermo King Corporation Thermo King...
Page 260: ...258 15 Thermo King...
Page 261: ...259 Thermo King Thermo King 1 2 3 4 5 Thermo King CYCLE SENTRY CYCLE SENTRY CYCLE SENTRY 50...
Page 262: ...260 Thermo King Service Procedure A26A...
Page 267: ...265 CYCLE SENTRY Thermo King CYCLE SENTRY...
Page 268: ...266 1 2 3 50 50 34 C 4 5 6 7 8 9 41 600 25 75 1 3 7 8...
Page 269: ...267 10 11 12 13 14 SLXe SPECTRUM 15 HSLO SLXe 300 Whisper Pro SR 3 PIEK 1 2 3 4 5 6 7 1 2 3...
Page 277: ...275 UNECE R10 BEA235 BEA236 BEA237 30 50 SLX SLXe BEN009...
Page 278: ...276...