83
Structural Maintenance
UNIT AND ENGINE MOUNTING BOLTS
Check and tighten all unit and engine mounting bolts during
scheduled maintenance inspections. Torque the unit mount-
ing bolts to 60 ft-lb (81 N•m). Torque the engine mounting
bolts to 150 ft-lb (203 N•m).
UNIT INSPECTION
Inspect the unit during pre-trip inspection and scheduled
maintenance inspections for loose or broken wires or hard-
ware, compressor oil leaks, or other physical damage which
might affect unit performance and require repair or replace-
ment of parts.
CONDENSER, EVAPORATOR, AND
RADIATOR COILS
Clean the coils during scheduled maintenance inspections.
Remove any debris (e.g., leaves or plastic wrap) that
reduces the air flow. Clean dirty coils with compressed air
or a pressure washer. Be careful not to bend the fins when
cleaning a coil. If possible, blow the air or water through the
coil in the direction opposite the normal airflow. Repair bent
fins and any other noticeable damage.
DEFROST DRAINS
Clean the defrost drains during scheduled maintenance
inspections to be sure the lines remain open.
UNIT INSTALLATION
All nuts that hold the unit to the trailer are accessible using
an impact wrench with a 10 in. extension, ball-type swivel
and a deep-well socket.
NOTE: The nuts for mounting the unit should be elastic
stop nuts (Nylock type).
1.
Check Bolts for Tightness
Unit and Engine Mounting Bolts
1
AJA894
AJA888
Summary of Contents for SB-190 30
Page 4: ......
Page 8: ......
Page 14: ...4...
Page 26: ...Unit Description Rev 12 03 16 Front View AJA890...
Page 40: ...Operating Instructions Rev 12 03 30...
Page 74: ...64...
Page 92: ...82...
Page 100: ...90...
Page 113: ...103 SB 100 190 Schematic Diagram Page 1 of 2...
Page 114: ...104 SB 100 190 Schematic Diagram Page 2 of 2...
Page 115: ...105 SB 100 190 Wiring Diagram Page 1 of 5...
Page 116: ...106 SB 100 190 Wiring Diagram Page 2 of 5...
Page 117: ...107 SB 100 190 Wiring Diagram Page 3 of 5...