
52
7-3. Setup and operating instructions
CAUTION
!
To prevent damage to the unit, do not program the output voltage and current to
higher then the power supply rating.
7-3-1. Setting up the power supply for 0V to 5V/0V to 10V Isolated Programming and Monitoring
Perform the following procedure to configure the power supply:
1. Turn the power supply AC power switch to off.
2. Connect a short between J1-8 and J1-12.
3. Set the Setup switch SW1 positions 1 and 2 to their Up position.
4. Set SW1position 3 to select the programming voltage range: Down=0V to 5V, Up=0V to 10V.
5. Set SW1position 4 to select the monitoring range: Down=0V to 5V, Up=0V to 10V.
6. Ensure that SW1positions 7 and 8 are in their down position.
7. Connect the programming sources to the mating plug of the Isolated Programming connector. Observe for
correct polarity of the voltage source.
8. Set the programming sources to the desired levels and turn the power supply ON.
CAUTION
!
J1-8 and J1-12 must be shorted together with a jumper.
7-3-2. Setting up the power supply for 4mA to 20mA Isolated Programming and Monitoring
Perform the following procedure to configure the power supply:
1. Turn the power supply AC power switch to off.
2. Set the Setup switch SW1positions 1 and 2 to their Up position.
3. Set SW1position 3 to it's up position.
4. Set SW1position 4 to it's up position.
5. Ensure that SW1positions 7 and 8 are in their Down position.
6. Connect the programming source to the mating plug of the Isolated Programming connector.
Observe for correct polarity of the voltage source.
7. Set the programming sources to the desired levels and turn the power supply ON.
CAUTION
!
SW1 position 3 and 4 must be in their Up position for operation with 4mA to 20mA
Isolated Programming and monitoring.
Summary of Contents for PU100-15
Page 10: ......