3
2. PRIOR TO USE
2-1. Initial inspection
Prior to shipment this power supply was inspected and found free of mechanical or electrical defects.
Upon unpacking of the power supply, inspect for any damage which may have occurred in transit.
The inspection should confirm that there is no exterior damage to the power supply such as broken knobs or
connectors and that the front panel and meters face are not scratched or cracked. Keep all packing material until the
inspection has been completed. If damage is detected, file a claim with carrier immediately and notify our sales or
service facility nearest you.
2-2. Accessories
Make sure the accessories are attached correctly. If there are any problems, please contact one of our sales
branches.
Accessories vary by model.
◆
Refer to the
2-3. Installation
This section contains instructions for initial inspection, preparation for use and repackaging for shipment.
◆
Connection to PC, setting the communication port and linking PU power supplies are described in
"6. RS232 & RS485 REMOTE CONTROL"
.
PU power supplies generate magnetic fields, which might affect the operation of other instruments.
if your equipment is susceptible to magnetic fields, do not position it a adjacent to the power supply.
2-4. Preparation for use
In order to be operational the power supply must be connected to an appropriate AC source. The AC source voltage
should be within the power supply specification.
◆
Do not apply power before reading,
and
"2-8. AC input power connection"
.
Table 2-1 below, describes the basic setup procedure. Follow the instructions in Table 2-1 in the sequence given to
prepare the power supply for use.
Table 2-1: Basic setup procedure
Step no.
Item
Description
Reference
1
Inspection
Initial physical inspection of the power supply
2
Installation
Installing the power supply,
Ensuring adequate ventilation.
2-6. Location, mounting and cooling
3
AC source
AC source requirements
Connecting the power supply to the AC source.
2-8. AC input power connection
4
Test
Turn-on checkout procedure.
2-9. Turn-on checkout procedure
5
Load connection
Wire size selection. Local /Remote sensing.
Single or multiple loads.
2-10-6. Making the load connections
6
Default setting
The power supply setting at shipment.
Summary of Contents for PU100-15
Page 10: ......