Version: Leo 18 GT_GB_02-2008
43
/
37
No.
Description of the tasks
Before
every
operatin
g
Wee
kly
Mon
thly
Year
ly
1. The checking of the equipment with
inspection
X
2. Checking the functions and the safety
devices.
Checking the stabilizing mechanism
(see:4.4.4)
X
3. The checking of the cleanness of the
machine
X
4. The checking of the oil level and state
and, if it necessary, it must be refilled
X
5. Lubrications must be achieved by the
attached lubricating plan
X
6. The state checking of the tubings and the
cylinders and the tightness of the hydraulic
system
X
7. The checking of the electric devices and
cables.
X
8. The tightening checking of the hollow
screws
X
9.
The cleaning of the hydraulic filter
X
10.
The checking of the hinge-pin and bushing
X
11.
The checking of all bearing of the moving
element.
X
12.
The oil filter changing.
X
13.
The filling up of the hydraulic system
X
14. The checking of the welded seams injury
and the corrosion
X
15. The cleaning as well as the lubrication of
the closed corners and the bogie.
X
16.
The renewing of the labeling and the
sticker as well as painting etc.
X
17.
The execution of the load test
X
18.
The checking of the hollow screw
tightness of the bogie
X
The oil must be changed in the machine once a year.
The Teupen Hungária Company or the acknowledged special companies of the
Teupen Hungaria Company should achieve the annual checking tasks.