6 Using the product
36
4. Enter values:
[
▲
]
,
[
▼
]
and sometimes
[
◄
]
,
[
►
]
→
[OK]
.
- Particulate matter probe is preheated to 50 °C (status display
flashes green).
- Measurement system is operational (status display lights up
green).
5.
[Next]
Adjustment help measurement: continue with point 9
Compliance measurement: continue with point 6
Approval test: continue with point 6
6. Start draught measurement:
[
]
.
- Draught
zeroing.
7.
Position the particulate matter probe in the centre of flow (area
of the highest flue gas temperature).
The display showing the maximum measured flue gas
temperature (
FT max
) helps when positioning the probe.
- The reading is displayed.
8.
End draught measurement:
[
]
9.
[Next]
If the message
Stability not yet achieved. Please wait…
appears, do not start any measurement until the message
is no longer displayed.