
TRGOVINA TERMOSTROJ d.o.o.
10250 Lučko, F. Puškarića 1d
Tel/Fax +385 1 6531-008, 6531-015, 6531-016 Eurposka unija
e-mail: [email protected] web:
http://www.termostroj.com
European Union
3. Maintenance
3.1. Periodic checking
We recommend the inspection of the device once a year by the authorized service provider (before
heating season). This service is not included in the warranty.
During the inspection all electric and
water connections should be tightened, the system should be vented and – if necessary – filled
up, valves and general functionality of the device should be checked.
RCCD switch - pressing the TEST button must disconnect the RCCD switch. This testing
procedure insures that switch is functioning properly. We recommend this test once or twice in
heating season.
Safety thermostat – we recommended to check safety thermostat before every heating season
by heating up the sensor with heating fan or lighter over 100°C
must actuate overheating
protection by switching off the RCCD switch.
Safety valve should be checked once a year (before the beginning of heating season) to ensure
proper functioning and avoiding appearance of water calculus.
If the boiler is not connected to the room thermostat or if the boiler is out of function during the winter
time, there is a danger of installation freezing.
In this case the system should be filled with antifreeze liquid for central heating, and if this is not
possible water should be drained out.
3.2. Cleaning
It is not permitted to use aggressive media (e.g. gasoline, kerosene or solvent) for cleaning
the product. Media for cleaning plastics or dishwashing media can be used for the external
shell and decorative cover. Control panel should be cleaned with dry or moist cloth (not wet).
3.3. Central heating system
If the boiler is not connected to the room thermostat (Termo boilers without C or W option), or if the
boiler is out of function during wintertime, there is a danger of installation freeze. In this case the
system should be filled with antifreeze liquid for central heating, if this is not possible water should be
drained out of the system with the help of charge and discharge.
The recommended pressure of central heating installation is 0,15 mpa (1,5 bar), the
maximum pressure is 0,25 mpa (2,5 bar).
3.4. Starting the pump manually
In order to access the pump, remove the front cover of the boiler as described below. In most cases
steps 1 and 2 are sufficient.
INSTALACIJSKE UPUTE
Zadržavamo pravo izmjene uputa bez posebne najave