ECOCONDENS SILVER PLUS
ISU-646:2016/GR-H str.9
2.4.5.1 The expected value of T depending on the setting C.H. water and the coefficient of ECO.
The expected value of T depending on the setting C.H. water and the coefficient of ECO.
Standard heating (P8 = 0): Setting WG
Eco
40°C
45°C
50°C
55°C
60°C
65°C
70°C
75°C
80°C
0,1
24
30
35
35
35
35
35
38
42
0,2
21
26
30
30
30
30
30
33
37
0,3
18
22
26
26
26
26
26
28
31
0,4
15
19
22
22
22
22
22
24
26
0,5
12
15
17
17
17
17
17
19
21
0,6
9
11
13
13
13
13
13
14
15
0,7
6
7
8
8
8
8
8
9
10
0,8
3
3
4
4
4
4
4
4
5
0,9
0
0
0
0
0
0
0
0
0
3. BOILER INSTALLATION
The boiler must be installed by an authorized service company accordingly with local regulations. After the boiler installation check the
tightness of all connections of gas, water and flue gas system. Service company is responsible for the proper installation of the boiler.
Installation of the boiler must be made so as not to cause any tension of the installation that may cause increased volume of work.
After exploitation of the boiler, disassembled product transfer to a specialized unit for utilization.
3.1. Requirements of boiler installation
3.1.1. The regulations on the water installation, gas and the flue gas system
Water, gas and flue gas systems must meet local regulations as well as use of the gas, ventilation and flue gas installation.
Using of gas appliances, flues and ventilation by the user should be consistent with local requirements relating to the technical
conditions of use the residential buildings.
Before installing the boiler the consent from the District Department of Gas, Chimney Sweep Company and Building Administration
must be obtained.
Gas appliances supplied with liquefied gas must not be installed in room with a floor below ground level.
If you use liquefied gas 3B/P it is recommended that the temperature in a room where a gas cylinder will be operated is not
less than 15°C.
3.1.2. Regulations related to the room
Requirements for premises where gas appliances are installed shall be in accordance with local regulations. The room where the boiler
is to be installed should ensure the air supply and venting system necessary for gas combustion in accordance with local regulations.
The location of ventilation should not cause the water freezing. The temperature in the room where the boiler is installed should be
higher than 6°C.
The room should be protected against freezing, free from dust and aggressive
gases.
It is forbidden to install the device in a laundry rooms, drying rooms and in
varnish, cleaners, solvents and sprays storages.
Boiler with a thermal capacity above 30 kW should be installed in a technical
room.
Place of installing a boiler in a room equipped with bath or shower with a pool
and the way of connecting it to the electrical system- in accordance with the
requirements of HD 60364-7-701. The device covered by this instruction has a
degree of electrical protection provided by the housing IP44. Boiler equipped
with power cord with a plug can be installed in zone 2 or further - must not be
installed in zone 1.
In zone 1 can be installed only if it is permanently connected to a power source
in accordance with HD 60364-7-701.
Fig. 3.1.2.1. The zones dimensions in areas containing a bath or shower with a pool
3.1.3. Requirements for electrical installation
The boiler has been designed for operation with single-phase alternating current with rated voltage of 230 V/50 Hz.
The boiler has been designed as a “class I“ device and must be connected to an electrical outlet with ground terminal in accordance
with PN- IEC 60364-4-41.
Pay attention on correctly connecting the power cord. If power cord is connected incorrectly:
- the boiler enters in failure state
- on display occurs E01 (
item 5.8.4)
In this case change cords “L” and “N” in the socket. When the correct connection is detected, the boiler unlocks automatically.
The boiler ECOCONDENS SILVER PLUS has a degree of electrical protection provided by the housing - IP44.
In case the boiler is permanently connected to the power supply the electrical installation should be equipped with means of
disconnecting the boiler from the power source, it should be execute by junction box. The junction box must be equipped with protection
degree appropriate for the defined assembly zone.
In order to connect the boiler to the junction box, it is recommended to:
- cut the power cord to a suitable length for connection to the box
- pull off cable insulation
- connect wire ends using soldering or tighten cable-end sleeve with appropriate diameter
Floor heating (P8 = 1): Setting WG
Eco
35°C
40°C
45°C
50°C
55°C
0,1
16
24
30
35
35
0,2
14
21
26
30
30
0,3
12
18
22
26
26
0,4
10
15
19
22
22
0,5
8
12
15
17
17
0,6
6
9
11
13
13
0,7
4
6
7
8
8
0,8
2
3
3
4
4
0,9
0
0
0
0
0
The main socket from which boiler is powered must complies with PN-IEC-60364-6-61:2000
2
2
5
c
m
60 cm
2
2
5
c
m
60 cm
Zone 1
Zone 2
Zone 1
Zone 0
Zone 1
Zone 2
Zone 0
Side view. Bath
Side view. Shower
Summary of Contents for ECOCONDENS SILVER PLUS-20
Page 31: ......