8-10
Lubrication and Servicing
AIR CONDITIONING RE-START PROCEDURE
If the machine has been idle for an extended period of time (2 weeks), the refrigerant in the air conditioning unit converts from a
gas to a liquid. This puts the compressor unit under a great deal of strain trying to compress a liquid instead of a gas and could
cause a failure in the air conditioning unit. The following commissioning procedure allows the air conditioning unit to achieve
normal operating parameters.
1. Start the machine and allow it to run until the engine is at a normal operating temperature of 80 °C (176 °F)
2. Turn the blower control to setting 1.
3. Turn on the air conditioning unit on for 5 seconds then off for 5 seconds.
4. Repeatedly switch the air conditioning on and off for at least 1 minute. This should be at least 12 repetitions.
5. Commissioning the air conditioning unit is complete and ready for use.
TYRE PRESSURES
Tyre pressures on this pages apply to the truck serial number range specified only, Gross Vehicle Weight (G.V.W.) and
axle weights may vary between truck derivatives. Tyre pressure should be recalculated if not shown for a particular truck.
Contact TEREX for assistance.
The tyre inflation pressures listed are manufacturers’ recommendations for G.V.W. travelling at maximum speed. TEREX
advise that operators check tyre inflation pressures with tyre manufactures to ensure correct setting for each particular
TYRE INFLATION PRESSURE
MODEL
MANUFACTURE
SIZE
PATTERN
FRONT
REAR
BAR
lb/in
2
BAR
lb/in
2
TR35
BRIDGESTONE
18.00-R25
VMTP
7.4
108
7.7
111
877
BRIDGESTONE
18.00-R25
VMTS
7.4
108
7.7
111
MICHELIN
18.00-R25
XHD1-A4
6.2
90
6.2
90
ALTURA
18.00-R25
GRIPMASTER ND
7.0
102
7.0
102
ALTURA
18.00-R25
GRIPMASTER XL
7.0
102
7.0
102
TR45
BRIDGESTONE
21.00-R35
VMTP
7.7
111
7.2
105
881
BRIDGESTONE
21.00-R35
VELS
7.7
111
7.2
105
MICHELIN
21.00-R35
XDT-A4
5.5
80
5.2
75
BELSHINA
21.00-35
BEL51-A
5.8
84
5.8
84
TR60
BRIDGESTONE
24.00-R35
VMTP
6.5
94
6.3
91
882
BRIDGESTONE
24.00-R35
VRLS
6.5
94
6.3
91
MICHELIN
24.00-R35
XDT-A4
5.5
80
5.5
80
BELSHINA
24.00-35
FBEL-150
5.5
80
5.5
80
TR70
BRIDGESTONE
24.00-R35
VMTP
7.9
114
7.9
114
913
BRIDGESTONE
24.00-R35
VRLS
7.9
114
7.9
114
MICHELIN
24.00-R35
XDT-A4
7.2
105
6.9
100
TR100
BRIDGESTONE
27.00-R49
VMTP
7.0
102
6.8
98
783
BRIDGESTONE
27.00-R49
VRLS
7.0
102
6.8
98
MICHELIN
27.00-R49
XDT-A4
6.6
95
6.6
95
PACETRONIC
27.00-49
E4D
6.6
95
6.6
95
BELSHINA
27.00-49
FBEL-150
6.4
93
6.4
93
TR100DD
BRIDGESTONE
27.00-R49
VMTP
7.0
102
6.8
98
883
BRIDGESTONE
27.00-R49
VRLS
7.0
102
6.8
98
MICHELIN
27.00-R49
XDT-A4
6.6
95
6.6
95
PACETRONIC
27.00-49
E4D
6.6
95
6.6
95
Summary of Contents for TR100
Page 2: ...This page is intentionally left blank ...
Page 4: ...This Page Intentionally Left Blank ...
Page 8: ...1 4 Introduction This Page Intentionally Left Blank ...
Page 10: ...This Page Intentionally Left Blank ...
Page 18: ...This Page Intentionally Left Blank ...
Page 20: ...This Page Intentionally Left Blank ...
Page 24: ...1 4 Introduction This page is intentionally left blank ...
Page 25: ...2 1 2 Safety ...
Page 26: ...2 2 Safety This Page Intentionally Left Blank ...
Page 52: ...2 28 Safety This Page Intentionally Left Blank ...
Page 53: ...3 1 3 Controls and Operating ...
Page 54: ...3 2 Controls and Operating This page is Intentionally left blank ...
Page 80: ...3 28 Controls and Operating This page is intentionally left blank ...
Page 81: ...4 1 4 Operating the Truck ...
Page 82: ...4 2 Operating theTruck This Page Intentionally Left Blank ...
Page 97: ...5 1 5 Working the Truck ...
Page 98: ...5 2 Working theTruck This Page Intentionally Left Blank ...
Page 104: ...5 8 Working theTruck This Page Intentionally Left Blank ...
Page 105: ...6 1 6 Roading ...
Page 106: ...6 2 Roading This Page Intentionally Left Blank ...
Page 109: ...7 1 7 Moving a Disabled Truck ...
Page 110: ...7 2 Moving a DisabledTruck This Page Intentionally Left Blank ...
Page 112: ...7 4 Moving a DisabledTruck This Page Intentionally Left Blank ...
Page 113: ...8 1 8 Lubrication and Servicing ...
Page 114: ...8 2 Lubrication and Servicing This Page Intentionally Left Blank ...
Page 123: ...9 1 9 Technical Data ...
Page 124: ...9 2 Technical Data This Page Intentionally Left Blank ...
Page 131: ...10 1 Symbol Identification 10 Symbol Identification ...
Page 132: ...10 2 Symbol Identification This Page Intentionally Left Blank ...
Page 136: ...10 6 Symbol Identification NOTES ...
Page 137: ...10 7 Symbol Identification NOTES ...
Page 138: ...10 8 Symbol Identification NOTES ...