Operator's Manual
First Edition • Third Printing
Operating Instructions
68
S
®
-40/45 XC
™
• S
®
-40/45
HF • S
®
-40/45 TRAX
™
Part No. 1274724GT
Pipe Cradle Operation
1 Be sure the pipe cradle assembly and
installation instructions have been followed
properly and that the pipe cradles are secured
to the platform railings.
2 Place the load so that it rests in both pipe
cradles. The length of the load should be
parallel with the length of the platform.
3 Center the load in the pipe cradles.
4 Secure the load to each pipe cradle. Pass the
nylon strap over the load. Depress the buckle
and slide the strap through. Tighten the strap.
5 Gently push and pull on the load to make sure
the pipe cradles and load are secure.
6 Keep the load secured when the machine is
moving.
Tip-over hazard. The weight of the pipe cradle
assembly and the load in the pipe cradles will
reduce the rated platform capacity of the
machine and must be factored into the total
platform load.
Tip-over hazard. The weight of the pipe cradle
assembly and the load in the pipe cradles may
limit the maximum number of occupants in the
platform.
Maximum Pipe Cradle Capacity
All models
200 lbs
90.7 kg
Pipe Cradle Assembly Weight
21 lbs
9.5 kg
Panel Cradle Assembly
1 Apply the warning decal to the front of each
panel cradle (if needed).
2 Install rubber bumper 1 in the panel cradle
base. See the illustration.
3 Secure the bumper with 2 high profile lock
nuts and 2 washers.
Panel Cradle Installation
1 Insert the hook piece through the slots in the
panel cradle base.
2 Hook the panel cradle to the bottom platform
tube in the desired location.
3 Install rubber bumper 2 through the panel
cradle base and the hook piece. See the
illustration.
4 Secure with 2 low profile lock nuts.
5 If the panel cradle is installed at a platform
floor support tube, insert the U-bolt through the
floor, around the tube and into the panel cradle
base.
6 Secure the U-bolt with 2 nuts and 2 washers.
Proceed to step 9.
7 If the panel cradle is not installed at a platform
floor support tube, use the aluminum tube
provided.
8 Place the tube between the panel cradle and
the platform floor. Insert the U-bolt through the
floor, around the tube and into the panel cradle
base.
9 Repeat above for the second set of parts.
Summary of Contents for Genie S-40 HF
Page 90: ......