1.
Lower the lift arms to the ground and relax the
bucket tilt/curl cylinders to relieve pressure within
the hydraulic system.
2.
Turn the ignition switch to the
OFF
position and
remove the key to avoid accidental start.
3.
Drain the hydraulic fluid. Refer to page 4-16 for the
hydraulic fluid and filter change procedure.
4.
Raise the hood at the rear of the machine.
5.
Disconnect the hose from the upper charge pump
fitting. (fig. 11-1)
6.
Loosen the hose clamp and disconnect the hose
from the barb type inlet tube on the underside of
the charge pump. (fig. 11-1)
7.
Remove the upper and lower 12 point bolts secur-
ing the charge pump to the engine. (fig. 11-2)
8.
Remove the charge pump from the engine. (fig.
11-3)
Installation
1.
To install the charge pump, reverse the removal
procedure.
Note:
The front bearing on the charge pump uses
engine oil for lubrication. It must be kept extremely
clean. Make sure to shield it as well as the opening to
the engine from dirt or debris while disassembled.
The gasket that seals the pump to the engine housing
should be replaced whenever the charge pump is
removed and installed to prevent oil leaks and or
dirt/debris from entering the engine during operation.
11-2
Rubber Track Loader
11. Hydraulic Pumps/Motors
11-1
11-2
11-3
Upper Hose
Lower Hose
Bolt
Gasket
https://tractormanualz.com/
Summary of Contents for ASV SR70
Page 5: ...IV https tractormanualz com...
Page 11: ...1 6 https tractormanualz com...
Page 41: ...4 20 https tractormanualz com...
Page 87: ...12 8 https tractormanualz com...
Page 105: ...14 6 https tractormanualz com...
Page 109: ...15 4 https tractormanualz com...
Page 125: ...16 16 https tractormanualz com...
Page 133: ...17 8 https tractormanualz com...
Page 137: ...18 4 https tractormanualz com...
Page 139: ...19 2 https tractormanualz com...