OPERATION
2-29
275 SERIES II MM190 (12---89)
Stack snow only with the blade in a straight-on
position. Do not create a vertical wall, but slope the
piles so that later snow may be pushed up the slope.
Clearing large open areas can be done best by
using a combination of snow removal equipment,
such as a snow blade and snow blower or loader of
some type. The snow can be plowed into windrows
or piles and then blown into or loaded onto trucks
and carried away. However, if only a blade is
available, the area can be cleared by using the
proper technique and common sense.
As a guide to help determine how much snow the
plow can handle, remember that with a 6 in
(150 mm) snowfall, the plow can easily move that
amount of snow in two passes. With more snow, it
will handle less; with less snow, more.
A suggested method of plowing is as follows:
Make the first pass one blade width in from the
outside edge.
Make the second pass around the outside edge,
moving the snow to the edge of the area, then keep
moving in. Double the blade width from edge of the
snow covered area and move this amount to the
outside edge.
TO REMOVE SNOW BLADE
1. Drive the machine to the snow blade storage
area.
2. Stop the engine and set the machine parking
brake.
FOR SAFETY: Before leaving or servicing the
machine; stop on level surface, set parking brake,
and turn off machine.
3. Lower the snow blade.
4. Disconnect the two limiting chains from the
machine frame.
5. Remove the upper ends of the mounting frame
from the lift arm cams.
6. Tilt the lift arm hooks back away from the lift
arm pins.
A
B
02759
LIFT ARM HOOK
A. Pin
B. Hook
7. Push the lift arms down to clear the lift arm
pins.
8. Start the engine, release the parking brake,
and back the machine away from the snow
blade assembly.
Summary of Contents for 275 Series II
Page 1: ...r 275 Series II Sweeper Scrubber ...
Page 6: ...ABOUT THIS MANUAL 275 SERIES II MM190 12 89 d ...
Page 18: ...SPECIFICATIONS 1 2 275 SERIES II MM190 12 89 ...
Page 22: ...SPECIFICATIONS 1 6 275 SERIES II MM190 12 89 ...
Page 24: ...OPERATION 275 SERIES II MM190 12 89 2 2 ...
Page 74: ...MAINTENANCE 3 14 275 SERIES II MM190 12 89 04644 HYDRAULIC SCHEMATIC LOW DUMP MODEL ...
Page 75: ...MAINTENANCE 3 15 275 SERIES II MM190 12 89 04645 HYDRAULIC SCHEMATIC MULTI LEVEL DUMP MODEL ...
Page 97: ...MAINTENANCE 3 37 275 SERIES II MM190 12 89 04643 ELECTRICAL SCHEMATIC DIESEL ...
Page 98: ...MAINTENANCE 3 38 275 SERIES II MM190 12 89 04642 ELECTRICAL SCHEMATIC ACCESSORIES ...
Page 99: ...MAINTENANCE 3 39 275 SERIES II MM190 6 90 06187 ELECTRICAL SCHEMATIC AUTO SHAKER RFS ...
Page 100: ...MAINTENANCE 3 40 275 SERIES II MM190 6 90 06187 ELECTRICAL SCHEMATIC AUTO SHAKER RFS ...