MAINTENANCE
3-67
275 SERIES II MM190 (6---90)
8. Level the squeegee from front to rear with the
two squeegee adjustment bolts on the cross
bar.
To lower the squeegee tips, thread the
adjustment bolts counter-clockwise evenly on
each side.
To raise the squeegee tips, thread the
adjustment bolts clockwise evenly on each
side.
A
B
C
04635
TIPS ADJUSTMENT BOLT
A. Squeegee Assembly
B. Adjustment Bolt
C. Cross Bar
9. Adjust the squeegee deflection with the two
squeegee adjustment studs.
To increase deflection, increase down pressure
by adjusting the stud forward.
A
B
C
04634
SQUEEGEE STUD
A. Squeegee
B. Stud
C. Jam Nut
To decrease deflection, decrease down
pressure by adjusting the stud backward.
Loosen the jam nuts on both ends of the rods
before making adjustments. Tighten the jam
nuts after making any adjustments.
10. Adjust the squeegee guards on each side of
the machine so they clear the floor by 1.5 in (40
mm).
A
B
04629
SQUEEGEE GUARD
A. Guard
B. Squeegee
Summary of Contents for 275 Series II
Page 1: ...r 275 Series II Sweeper Scrubber ...
Page 6: ...ABOUT THIS MANUAL 275 SERIES II MM190 12 89 d ...
Page 18: ...SPECIFICATIONS 1 2 275 SERIES II MM190 12 89 ...
Page 22: ...SPECIFICATIONS 1 6 275 SERIES II MM190 12 89 ...
Page 24: ...OPERATION 275 SERIES II MM190 12 89 2 2 ...
Page 74: ...MAINTENANCE 3 14 275 SERIES II MM190 12 89 04644 HYDRAULIC SCHEMATIC LOW DUMP MODEL ...
Page 75: ...MAINTENANCE 3 15 275 SERIES II MM190 12 89 04645 HYDRAULIC SCHEMATIC MULTI LEVEL DUMP MODEL ...
Page 97: ...MAINTENANCE 3 37 275 SERIES II MM190 12 89 04643 ELECTRICAL SCHEMATIC DIESEL ...
Page 98: ...MAINTENANCE 3 38 275 SERIES II MM190 12 89 04642 ELECTRICAL SCHEMATIC ACCESSORIES ...
Page 99: ...MAINTENANCE 3 39 275 SERIES II MM190 6 90 06187 ELECTRICAL SCHEMATIC AUTO SHAKER RFS ...
Page 100: ...MAINTENANCE 3 40 275 SERIES II MM190 6 90 06187 ELECTRICAL SCHEMATIC AUTO SHAKER RFS ...