OPERATION
2Ć3
1186 MM267 (6–94)
PREPARATION FOR OPERATION
AFTER UNCRATING AND BEFORE
OPERATING MACHINE:
1. Check the machine for shipping damage.
2. Read this manual carefully before operating
or servicing the machine.
FOR SAFETY: Do Not Operate Machine Unless
Operation Manual Is Read And Understood.
3. Check the engine oil level. See ENGINE in
the MAINTENANCE section.
4. Check the main brush adjustment. See
BRUSHES in the MAINTENANCE section.
5. Fill the fuel tank, or install an LPG fuel tank
on the machine.
FOR SAFETY: When Servicing Machine, Keep
Flames And Sparks Away From Fuel System
Service Area. Keep Area Well Ventilated.
Summary of Contents for 1186
Page 1: ...1186 MM267 Rev 05 12 95 Operator Manual ...
Page 8: ...GENERAL INFORMATION 1186 MM267 6 94 vi ...
Page 10: ...SPECIFICATIONS 1186 MM267 6 94 1Ć2 ...
Page 14: ...OPERATION 1186 MM267 6 94 2Ć2 ...
Page 32: ...MAINTENANCE 1186 MM267 6 94 3Ć2 ...
Page 46: ...MAINTENANCE 1186 MM267 6 94 3Ć16 ELECTRICAL SCHEMATIC 06779 ...
Page 68: ...APPENDIX 1186 MM267 6 94 4Ć2 ...
Page 70: ...APPENDIX 1186 MM267 6 94 4Ć4 ...