7.2  Generalities and choice of the 

installation place

 

WARNING! 

      

 

• 

Install the unit in an internal environment.

• 

The unit must not to be install near heat or steam sources.

• 

Install the internal unit respecting the minimal distances 

from walls and obstacles for facilitate the assembly and 

maintenance operations.

• 

Secure a proper air circulation.

• 

Install the unit in a vertical position, as shown in figure at 

paragraph 7.1.

7.3  Assembly internal unit and correct 

positioning of B2 probe

The unit has to be fixed to the wall using dowels and L supports. 

Lift the unit and hang it on the wall. Caution, it is advisable to 

be at least in two persons or more, as the excessive weight can 

cause serious injuries.

Probe cable B2

The  B2  probe  cable  must  be  positioned 

sideways respecting a distance of 2 m from 

the internal unit, it must alight at man height 

paying attention it cannot be in direct contact 

with the wall because it is primary that the 

cable of this probe be at least 3cm away from 

the wall.

2 m

Probe cable B2

8  Refrigerant circuit  onnection

The  refrigerant  pipes  connections  have  to  be  made  up  by 

qualified and licensed personnel. The connections requires the 

use of a weld tool.

8.1  Installation requirements

• 

The connecting tubes between internal and external units 

have to respect the below indicated dimensions.

• 

Non  respecting  of  indicated  measurements  can  lead  to 

significant decrease of the machine performance.

• 

If the internal unit is installed at a higher level than the 

external  unit,  it  is  necessary  to  provide  some  specific 

siphons each 5 meters high on the refrigerant conduit 

return to facilitate the oil return eventually remained in the 

circuit

Nominal 

lenght

Maximum 

lenght

of the piping  

(

m of equivalent 

length

)

Maximum 

height 

difference

(

m of equivalent 

length

)

Additional 

refrigerant 

charge 

recommended *

(g/

m of equivalent 

length

)

All models

1

30

30

45

* sub-cooling must be in a range between 3°C and 4°C with heat pump in steady state.

NOTE:  the  parameter  equivalent  lenght  has  to  consider  the 

curves too. Each 90° curve in the circuit has to be counted as 

a  1 m straight portion. Each 180° curve in the circuit has to be 

counted as a  2 m straight portion. Each oil trap in the circuit has 

to be counted as a  4 m straight portion.

8.2  Preparation for installation and 

refrigerant pipelines installation

The  coolant  pipes  connections  must  be  sealed  to  prevent 

leakage of the coolant and the consequent malfunctioning of the 

heating pump. The connection pipes must be insulated and have 

diameters specified in the following table.

Gas (mm)

Liquid (mm)

KITA AIR

Ø 28

Ø 16

For the preparation of the pipes for installation, proceed as

follows:

• 

Measure the distance between internal and external units, 

and perform all necessary installation curves..

• 

The laying of the pipes must include the minimum number 

of bends, because each curve increases the pressure drop 

of the circuit and reduce the machine performance.

•  Cut the pipes to a length slightly greater than that 

measured.

• 

Completely remove smudging from the cut section, holding 

the pipe downward and blowing air into the pipe.

• 

Respect the safety measures that are indicated into the 

table, or add the request quantity of refrigerant.

• 

Weld the provided manufacturer’s anchors at the end of 

the connection pipe. Weld the inner side female anchors 

and  the  outer  side  male  anchors.  Where  is  possible, 

perform welding in nitrogen atmosphere. Otherwise at the 

end of welding operation blow the nitrogen braise points..

• 

Insulate carefully the refrigerant anchors and connections.

Summary of Contents for KITA AIR

Page 1: ...INSTALLATION INSTRUCTION AIR TO AIR T H E H E A T P U M P...

Page 2: ...ts 8 6 3 Free spaces for the assembly 8 6 4 Choice of installation place 9 6 5 External unit mounting 9 6 6 Condensate discharge preparation 9 6 7 Correct alignment 10 6 8 Probe installation 10 7 Mont...

Page 3: ...8 12 5 Electric diagram KITA AIR 19 12 6 Internal wiring connection diagram 20 13 Commissioning 21 13 1 Preliminary controls 21 13 2 Commissioning 21 14 Control unit 22 14 1 Control panel measurement...

Page 4: ...sary please request for original parts You can find all informations on the KITA Templari label in accordance with the regulation on labeling in particular you can find Voltage and frequency of Power...

Page 5: ...supply For design and realization of the heat pump all the CE directives and all the DIN and VDE have been observed The electric connection of the heat pump must be made in accordance with the VDE EN...

Page 6: ...e indicated on the plate 1 Figure 1 and 2 figure 1 1 3 3 Operation mode The heat pump can operate in two modes actionable trough the switching of the 4 way valve as shown below this modes are heating...

Page 7: ...mension 1 Deflector 2 Fan 3 Case 4 Battery exchanger 5 Electric box 6 Side cover remove to access to electric box 7 Probe cable B2 prewired to unroll The image is intended only to indicate the main in...

Page 8: ...he provisions in force It is recommended to pay attention do not to overexertion when lifting the internal unit It is advisable to be at least in two persons 6 Mounting and installation 6 1 Equipment...

Page 9: ...are snowfalls install the heat pump at least 25 cm from the ground to avoid clogging at the inlet and drain zone 6 5 External unit mounting 1 Before installing the device please see the safety warnin...

Page 10: ...e irreparable damages to the evaporator In places where there are snowfalls install the heat pump at least 25 cm from the floor to avoid clogging in the suction and condensate drain area 6 7 Correct a...

Page 11: ...the circuit Nominal lenght Maximum lenght of the piping m of equivalent length Maximum height difference m of equivalent length Additional refrigerant charge recommended g m of equivalent length All...

Page 12: ...connect the pump charging vacuum connection procedure 1 4 inside the external unit Perform the vacuum until reaching 0 4mbr pressure duration of procedure for about 1 h for 15m total length connection...

Page 13: ...or incrustations of various kinds also provoking a malfunctioning of the heat pump It is possible then clean the battery with a under pressure jet of air in a parallel direction of the fins you should...

Page 14: ...cable The cable carries low voltage control signals find a route far from sources of interference do not joints along the way possibly using a 3 core cable shield section 1 50 sq mm shield connected...

Page 15: ...ower supply cables indication KITA AIR External unit Supply 400 Vac 50 Hz Cable 5x6 mmq Secondary line protection 230 PC protection 24 Vdc 3 fuses 5x20 4A 1 fuse 5x20 4A Internal unit Supply 230 Vac 5...

Page 16: ...E 1 3 5 7 9 11 2 4 6 8 10 12 B2 1 3 5 7 9 11 2 4 6 8 10 12 B2 Gnd B4 GND B5 VDC B3 GND Y3 GND B7 GND C 230V auxiliary power supply internal fan A Auxiliary fuses 4 A B Power Phase Neutal and Ground fo...

Page 17: ...switch high DI6 solar boost SGR bit0 DI8 remote on off DI9 P Lan protocol DI10 flow switch present on old models F4 Elektrische Sicherung 5x20 250 mA Y2 Y3 PWM Circulator GND 5VR C4 NO8 NO9 NO10 NO11...

Page 18: ...alve 14 Block outputs C1 NO1 NO3 15 Block outputs C2 NO4 NO6 16 Block outputs C3 No7 Nc7 17 Block outputs C4 NO8 NO12 18 Bar hooks Din 35 6 1 2 3 4 5 9 7 8 17 10 11 12 13 14 15 16 18 18 18 12 1 Digita...

Page 19: ...IDC2 J8 J10 J12 J13 J14 J15 J1 5 J 4 J 3 J 2 J J18 J16 R S T N R S T N N EVV EVV M OUT 5vrf M OUT 5vrf R S T Heater condensate drain Injection valve 4 4 CH 3 RS485 M 3 M 3 RS485 Bridge to the terminal...

Page 20: ...2 1 N Lok 6 Yellow Green N Blue T Brown N Blue N Blue NO11 6 5 4 3 2 1 N Lok 9 Brown PE Yellow Green No10 Brown 8 7 9 20 19 B6 B1 14 13 12 11 10 9 Molex Mini Fit Jr 20 White 5V Red Gnd Black B11 B10 W...

Page 21: ...y the proper operation Access to menu D inputs outputs to control the different temperatures from sensors Screen D01 B1 it shows the value of liquid sub cooling in the heat pump it has to stay in a ra...

Page 22: ...ivation It activates when the solar panels are installed and active It activates when the defrosting procedure is active 4 Unit status The unit can be in one of the following states OFF ON ENERGY S AU...

Page 23: ...20 percentage points Those conditions permit to work with a noisiness more and more reduced We underline that setting this function the efficiency of the machine too is progressively reduced Mask B06...

Page 24: ...the other days press and proceed as explained above Contrary it is possible to copy the setting in different days once entered in mask C02 press the button to have access to the choice of the day you...

Page 25: ...ating DSH Discharge Super Heating Mask D19 Parameters Inverter Engine Mask D20 Parameters Inverter Engine Mask D21 Parameters Inverter Engine Masks D30 D31 masks relevant to the external battery fan Y...

Page 26: ...ion is active OFF Propor it s the percentage of the proportional band Hc06 that as defaut is set at 10 under that the integration shut down OFF Diff Degrees the integration has to produce more on Setp...

Page 27: ...the defrosting is finished because the maximum time is exceeded Mask Gfc50 It allows to enable the condensate drain in fix or intermittent mode in base on the external temperature Res drain cond it e...

Page 28: ...bles speed manual management of compressor for the heat pump in heating and cooling speed if the manual management is active it shows the compressor speed for the heat pump Mask Gg06 it enables the de...

Page 29: ...ors D06 Analog sensors D07 Fan speed Circulator speed D08 Cooling circuit status D09 Work regime D10 Work pressures D11 Work pressures D14 Drain Gas Control D15 EED set up D19 Inverter Engine paramete...

Page 30: ...A12 Probe B12 broken or disconnected Automatic 60 sec Yes Stop the machine ALB01 Position ID3 High pressure Manual Immediate Yes Stop the machine ALB02 High pressure of the compressor 1 from transduce...

Page 31: ...e Immediate Settable Gfa01 Only signal ALT08 Threshold reached worked hours outside battery fan Manual Immediate Settable Gfa01 Only signal ALU01 Geothermal frosting protection exchanger Manual par Gf...

Page 32: ...of time the cause can be the inertia of the system and the nearness between the temperatures of air and water If it occurs occasionally it s just a no serious signal permitting to the unit to keep on...

Page 33: ...umer 1 Nominal diameter mm 910 Maximum input power kW 0 625 Maximum current A 1 1 Max speed rps 610 Max air flow m3 h 15000 Internal fan Model EBMPAPST Type Inverter BLDC Numer 1 Nominal diameter mm 8...

Page 34: ...ate Applied standard Standard Armonizzati EN 55014 1 2006 A1 2009 EN 55014 2 1997 A 2001 A2 2008 EN 61000 3 2 2006 A1 A2 2009 EN 61000 4 2 2008 61000 4 4 2008 EN 61000 4 5 2008 EN 61000 4 6 2008 Angew...

Page 35: ...Note...

Page 36: ...vers 26 07 2019 C via Pitagora 20A 35030 Rubano PD Italia Tel 39 049 8597400 39 049 5225929 www templari com info templari com T H E H E A T P U M P...

Reviews: