Cyclone User Manual
21
Anti-Vibration kit Installation
To avoid possible picture ‘wobble’, Tempest
recommends the use of the optional anti-vibration
mounting kit when:
a)
The cooler is mounted on the same
structure as the projector enclosure, AND
b)
The projection throw is over 50m (150ft)
This should not be needed if the above conditions are
not met.
Mount the four vibration pads to the middle holes in
the cooler feet, using the hardware provided.
Mount the vibration standoffs to your structure using
8mm hardware (not supplied).
Condensate Drain Hose
Small amounts of water condensate will drip out of the
drain in the base of the cooler.
You may attach an extension hose to the condensate
drain hose, connected to a suitable drain opening.
Use a hose with internal diameter approximately
19mm [¾”].
ø
19mm [¾”]