TP-8/16/24/32/64S User Manual Version No.: V1.2
- 15 -
2.2.1 Cabinet-type Fixing
Users are able to install the Voice gateway with big port in the standard cabinet
based on needs. If on-site installation is necessary, users are required to comply with:
1. First, clean up where the subframe will be put in the cabinet, tidy the former
cables and place them in the cable area at two sides of rack, adjust the supporting plates
of right and left subframes to be in place, and insert the combined nuts in the attachment
into square holes at front two sides of the cabinet (4 for each side);
2. Operated by two persons, slightly put the subframe on the supporting plate of the
cabinet , and push it in place slowly;
3. After positioning, use the combined screws (M6×16) with packing ring from the
accessories to tightly fix subframe and cabinet together.
Figure 2-1 Installation Completion Diagram
2.2.2 Plan Fixing
Take out four rubber mats equipped with Voice gateway and clip them into four
small holes on the device’s base plate, and then put the device on a stable and flat desk,
and make sure right and left sides have a good ventilation.
Reminding: Ensure Voice gateway to ventilate well at two sides; and
prohibit to place any object on it.
2.3 Cable Connection
1.
General connection
By cable, voice gateway’s LAN port is connected with user’s computer, switch or hub,
and the WAN port is connected with Ethernet (for instance, ONU) or ADSL modem. FXS
port is connected with 32 pair of single-core copper connector. AC power port is
connected with AC power .