08354B DCN7877
Teledyne API T640 PM Mass Monitor
36
Figure 2-25. Concentration Graph and Meter Graph
STARTUP AND FUNCTIONAL CHECKS
STARTUP
Upon initial startup, allow the instrument to run for at least 10 minutes to reach
stable operating conditions. Be sure the LED temperature has stabilized before
valid measurements are obtained. No adjustments or calibrations should be
performed until the LED temperature has stabilized.
FUNCTIONAL CHECKS OF OPERATING PARAMETERS
After warm-up, navigate to the Dashboard screen to verify that the Monitor is
functioning within allowable operating parameters (the Appendix shows the list of
test functions and their expected values; the enclosed
Final Test and Validation
Data sheet
lists these values as they appeared before the instrument left the
factory). If not all test functions and values are displayed here, touch the
configuration icon to insert additional functions into the Dashboard (Section 3.2.2
has more details).
These functions can also be used as diagnostic tools for troubleshooting a
performance problem.
Summary of Contents for T640
Page 2: ......