08354B DCN7877
Teledyne API T640 PM Mass Monitor
16
VENTILATION CLEARANCE
Whether the Monitor is set up on a bench or installed in an instrument rack, be sure
to leave sufficient ventilation clearance.
Table 2-1. Ventilation Clearance
AREA
MINIMUM REQUIRED CLEARANCE
Back of the instrument
10 cm / 4 in
Sides of the instrument
2.5 cm / 1 in
Above and below the instrument
2.5 cm / 1 in
INSTRUMENT LAYOUT
FRONT PANEL
Figure 2-3 shows the front panel layout, which has the display screen, two USB
ports for peripheral device connections: mouse and keyboard as alternatives to the
touchscreen interface, or flash drive for uploads/downloads (devices not included).
Figure 2-3. Front Panel Layout
Summary of Contents for T640
Page 2: ......