MERIDIAN
UNIVERSAL GAS DETECTOR
INSTALLATION
4-33
USE AND DISCLOSURE OF DATA
Information contained herein is classified as EAR99 under the U.S. Export Administration Regulations. Export, reexport or diversion contrary to U.S. law is
prohibited.
6. Locate SW1 (isolated/non-isolated) on the power supply PCB. Place SW1 in the UP position (refer to
Sourcing and Sinking Isolated (SW1) Settings
).
7. Locate J3 (WiredHART) on the power supply PCB. Place J3 in the correct position to support your application,
(refer to
.
8. Insert and tighten the four (4) standoffs.
9. Push the LCD PCB/CPU PCB set into the four (4) standoffs.
10. Install housing cover, tighten and secure the setscrew.
11. Apply power to receiver.
12. Insert the lower PCB stack into the housing after wiring the terminal blocks.
Table 4-12: Sourcing and Sinking Isolated (SW1) Settings
SW1 Isolated/Non-Isolated
SW1 Settings
UP Position
CAUTION:
The SW1 switch can only electrically isolate sensor loop1. Connecting the Meridian
to Sensor Loop2 and Loop3 will not isolate them. DO NOT use this type of wiring with multi-sensor
headed Meridians.
Table 4-13: WiredHART (J3) Settings
SW1 Isolated/Non-Isolated
SW1 Settings
For Normal = Position 3&5 for -/+
For Hart = Position 1&3 for -/+
NOTE: J3 only pertains to the WiredHART PCB.