
Maintenance
Model 6750
Teledyne Analytical Instruments
66
3.
Place tubing in the right groove and against
the first two rollers.
4.
Hold tubing with thumb.
5.
Near groove, insert smaller prong of
loading key between the top of the rotor
and tubing.
6.
Push key in as far as possible.
7.
Push down and turn key counterclockwise
(ccw) completely around the rotor.
8.
The key will push the tubing uniformly into
the end bell assembly.
9.
Hold the second end of tubing.
10.
Remove the key.
Summary of Contents for 6750
Page 16: ...Introduction Model 6750 Teledyne Analytical Instruments 4 ...
Page 32: ...Theory of Operation Model 6750 Teledyne Analytical Instruments 20 ...
Page 40: ...Installation Model 6750 Teledyne Analytical Instruments 28 ...
Page 92: ...Appendix Model 6750 Teledyne Analytical Instruments 80 ...