
Total Organic Carbon Analyzer
Setup and Operation
Teledyne Analytical Instruments
41
4.5 Shutdown
Prior to shutdown of the analyzer or performing service on the
reactor, flush D. I. water through all sample and reagent lines for at least
30 minutes to clean all tubing.
CAUTION: FAILURE TO OBSERVE ADEQUATE FLUSHING
COULD RESULT IN HARMFUL ACID BURNS AND/OR
A REACTOR CLOG.
4.6 Historical Data
Previous data
may be obtained by selecting [CHART] from the
screen. The following menu will appear.
The display scale can be adjusted using the Select [TOC SCALE]
item from the [CHART] menu. The following screen will appear.
Edit Scale as desired.
Summary of Contents for 6750
Page 16: ...Introduction Model 6750 Teledyne Analytical Instruments 4 ...
Page 32: ...Theory of Operation Model 6750 Teledyne Analytical Instruments 20 ...
Page 40: ...Installation Model 6750 Teledyne Analytical Instruments 28 ...
Page 92: ...Appendix Model 6750 Teledyne Analytical Instruments 80 ...