
Setup and Operation
Model 6750
Teledyne Analytical Instruments
30
Figure4-1: Drain Connections
5.
On initial start–up or after UV Reactor or Glass Liquid
Separator (GLS) servicing, fill the U-Tube with D. I.
water as indicated in Figure 4-2.
6.
After all of the above checks, turn analyzer ON by
activating the facility power switch. The system starts up
in Run Mode.
7.
Immerse line from “sample” port of the analyzer into D.
I. water container.
8.
Immerse persulfate line from the “persulfate” port of the
analyzer into persulfate container.
9.
Immerse acid line from the “ACID IN” port of the
analyzer into ACID container.
Summary of Contents for 6750
Page 16: ...Introduction Model 6750 Teledyne Analytical Instruments 4 ...
Page 32: ...Theory of Operation Model 6750 Teledyne Analytical Instruments 20 ...
Page 40: ...Installation Model 6750 Teledyne Analytical Instruments 28 ...
Page 92: ...Appendix Model 6750 Teledyne Analytical Instruments 80 ...