
Maintenance
Model 6750
Teledyne Analytical Instruments
58
well as the sample inlet line and submerse all three (3)
lines into D. I. water to completely flush system.
CAUTION:
FAILURE TO DO SO MAY RESULT IN ACID BURNS,
CLOGGED REACTOR, ETC. FLUSH FOR 30
MINUTES.
2.
Turn off power.
3.
Disconnect electrical connectors.
4.
Disconnect tubing.
5.
Remove thumbnuts holding UV Reactor in—place.
6.
Remove UV Lamp (See Figure 5-9).
To clean the UV Reactor Assembly:
1.
Run warm water through all tubing until clean.
2.
Replace assembly as before.
3.
Charge reactor with D. I. water.
4.
Recalibrate analyzer.
5.3.8 UV Power Supply
The UV Power Supply (P/N ST15002 for 110 VAC or P/N
ST15000 for 220VAC) is normally checked with another good UV
lamp. If it activates the UV lamp, the UV Power Supply is good. If the
Power Supply is not good, replace the Module (P/N ST15002 for 110
VAC or P/N ST15000 for 220 VAC). See Figure 5-10.
To replace the UV Power Supply:
1.
Turn power off.
2.
Disconnect UV and main power connectors.
3.
Remove power supply mounting screws.
4.
Replace power supply.
5.
Reverse steps for installation.
6.
Recalibrate liquid and span value.
Summary of Contents for 6750
Page 16: ...Introduction Model 6750 Teledyne Analytical Instruments 4 ...
Page 32: ...Theory of Operation Model 6750 Teledyne Analytical Instruments 20 ...
Page 40: ...Installation Model 6750 Teledyne Analytical Instruments 28 ...
Page 92: ...Appendix Model 6750 Teledyne Analytical Instruments 80 ...