
Total Organic Carbon Analyzer
Maintenance
Teledyne Analytical Instruments
57
CAUTION:
THE UV LIGHTED LENGTH MUST BE AT LEAST 12
½
INCHES FOR PROPER OPERATION. DO NOT USE
STANDARD 12 INCH LIGHTED LENGTH UV LAMPS.
2.
Turn off power allow 10 minutes for cool down.
3.
Disconnect electrical connectors.
4.
Loosen fittings as illustrated.
5.
Remove UV Lamp.
6.
Recalibrate analyzer.
5.3.7 UV Reactor Assembly (P/N ST20003-1)
If malfunctioning, clean the assembly. If still malfunctioning,
replace the assembly (P/N ST20003-1). See Figure 5-9.
Figure 5-9: Removing the UV Reactor Assembly
To Replace the UV Reactor Assembly:
1.
Turn off UV Lamp at the UV Power Supply. Remove
Persulfate and Acid Reagent lines from containers, as
Summary of Contents for 6750
Page 16: ...Introduction Model 6750 Teledyne Analytical Instruments 4 ...
Page 32: ...Theory of Operation Model 6750 Teledyne Analytical Instruments 20 ...
Page 40: ...Installation Model 6750 Teledyne Analytical Instruments 28 ...
Page 92: ...Appendix Model 6750 Teledyne Analytical Instruments 80 ...