
Total Organic Carbon Analyzer
Setup and Operation
Teledyne Analytical Instruments
29
Setup and Operation
Once the analyzer has been installed, it can be configured to your
application. To do this you will:
•
Set system parameters
•
Calibrate the instrument
•
Define the analysis range. Then choose auto-ranging or
select a fixed range of analysis, as required.
•
Set alarm setpoints, and modes of alarm operation (latching,
failsafe, etc.)
4.1 Analyzer Startup
Referring to the Installation section and “AS-BUILT” Drawings in
the Appendix, check the following:
1.
Air/oxygen supply – This must provide a constant
pressure of 15 +/- 2.0 psi, ultra-pure oxygen or CO
2
–free
air at a flow rate up to 500 cc/minute. (Pre-purified air
may be used with optional Air Purifier P/N ST910003).
2.
Drain Line – Check to see if the drain line is free of kinks
and loops and allows normal vented gravity flow to an
open receptacle (jar, pipe, etc.). AN AIR GAP AS
DEFINED IS MANDATORY.
CAUTION: FAILURE TO OBSERVE THIS WILL RESULT IN
IMPROPER OPERATION.
3.
ELECTRICAL – Assure proper electrical installation.
Refer to facility requirements.
4.
SAFETY – All customer and Teledyne specified safety
measures are followed.
Summary of Contents for 6750
Page 16: ...Introduction Model 6750 Teledyne Analytical Instruments 4 ...
Page 32: ...Theory of Operation Model 6750 Teledyne Analytical Instruments 20 ...
Page 40: ...Installation Model 6750 Teledyne Analytical Instruments 28 ...
Page 92: ...Appendix Model 6750 Teledyne Analytical Instruments 80 ...