![background image](http://html1.mh-extra.com/html/tektronix/tla-711/tla-711_installation-manual_1077691020.webp)
Basic Installation
4
TLA 700 Series Installation Manual
Figure 1 shows chassis ground connections. Use the chassis ground connections
to connect the grounds of one or more instruments to the logic analyzer to ensure
a common ground connection between instruments.
WARNING.
Do not remove the safety ground screw from the benchtop mainframe.
The safety ground screw must always be in place to ensure the proper bonding of
the power supply to the mainframe.
Chassis ground
Safety ground
(Benchtop
mainframe only)
Figure 1: Location of ground connections
Chassis Ground
Connections
Summary of Contents for TLA 711
Page 4: ......
Page 8: ...Table of Contents iv TLA 700 Series Installation Manual...
Page 12: ...Service Safety viii TLA 700 Series Installation Manual...
Page 30: ...Basic Installation 14 TLA 700 Series Installation Manual...
Page 32: ...Installing Microprocessor Support Software 16 TLA 700 Series Installation Manual...
Page 34: ...The Next Step 18 TLA 700 Series Installation Manual...
Page 56: ...Appendix A Merging Logic Analyzer Modules 40 TLA 700 Series Installation Manual...