Performance Tests
1–38
TDS 510A Performance Verification and Specifications
Time Base System Checks
These procedures check those characteristics that relate to the Main and Delayed
time base system and are listed as checked under Warranted Characteristics in
Specifications.
Equipment
Required
One time-mark generator (Item 11)
One 50
, precision coaxial cable (Item 5)
Prerequisites
See page 1–15.
50
Coaxial Cable
Time Mark
Generator
Digitizing Oscilloscope
Output
Figure 1–11: Initial Test Hookup
1. Install the test hookup and preset the instrument controls:
a. Hook up the test-signal source: Connect, through a 50
W
precision
coaxial cable, the time-mark output of a time-mark generator to CH 1.
Set the output of the generator for 10 ms markers. See Figure 1–11.
b. Initialize the oscilloscope:
Press save/recall SETUP. Press the main-menu button Recall
Factory Setup. Press the side-menu button OK Confirm Factory
Init.
c.
Modify the initialized front-panel control settings:
Set the vertical SCALE to 200 mV (or 500 mV with the optional
Tektronix TG 501A Time Mark Generator)
Press VERTICAL MENU; then press the main-menu button
Coupling. Press the side-menu button
to toggle it to the 50
setting.
Press SET LEVEL TO 50%.
Check Accuracy for
Long-Term Sample Rate
and Delay Time
Measurements
Summary of Contents for TDS 510A
Page 3: ......
Page 4: ......
Page 12: ...Preface viii TDS 510A Performance Verification and Specifications...
Page 13: ...Performance Verification...
Page 14: ......
Page 18: ...Performance Verification Procedures 1 4 TDS 510A Performance Verification and Specifications...
Page 32: ...Performance Tests 1 18 TDS 510A Performance Verification and Specifications...
Page 96: ...Performance Tests 1 82 TDS 510A Performance Verification and Specifications...
Page 97: ...Specifications...
Page 98: ......
Page 106: ...Nominal Traits 2 8 TDS 510A Performance Verification and Specifications...
Page 112: ...Specifications 2 14 TDS 510A Performance Verification and Specifications...