K1297-G20 Monitor User Manual
9
Getting Started
This chapter tells you how to prepare the Protocol Tester for start-up, this
means how to set up the device, how to exchange the measuring modules,
how to connect the data line, and how to switch on the device.
Information on switching off the device and how to prepare the Protocol
Tester for transport is included at the end of this chapter.
NOTE.
The device has been delivered according to your requirements.
Please examine the merchandise for visible transport damage and for
completeness using the pick slip.
Summary of Contents for K1297-G20
Page 4: ......
Page 12: ...Service Safety Summary viii K1297 G20 Monitor User Manual...
Page 100: ...Examples 88 K1297 G20 Monitor User Manual...
Page 122: ...Appendix A Interfaces A 22 K1297 G20 Monitor User Manual Figure A 1 AP 4 AP 4 256 Board...
Page 139: ...Appendix A Interfaces K1297 G20 Monitor User Manual A 39 Figure A 5 V X board...
Page 158: ...Appendix A Interfaces A 58 K1297 G20 Monitor User Manual...
Page 170: ...Appendix B Keyboard B 12 K1297 G20 Monitor User Manual...
Page 190: ...Appendix D Windows XPe Troubleshooting E 12 K1297 G20 Monitor User Manual...