Controls, Connectors, and Indicators
Figure 2-4. Horizontal controls and indicators.
B —Select B sweep horizontal deflection. The B sweep speed is
determined by the B SEC/DIV switch setting as displayed in the crt
readout. Whenever B MODE is selected, the A/B SELECT switch is set
to B Trigger.
The start of the B sweep in RUNS AFTER mode (or the arming of the B
Trigger in any triggered mode) is delayed from the start of the A sweep
by a time determined by the setting of the K- OR DELAY TIME control.
The B SEC/DIV switch setting and the Delay Time Position setting are
2252
Operators
2 -9
Summary of Contents for 2252
Page 17: ...SECTION 1 INTRODUCTION 2252 Operators ...
Page 18: ......
Page 26: ......
Page 27: ...SECTION 2 CONTROLS CONNECTORS AND INDICATORS 2252 Operators ...
Page 28: ... f ...
Page 55: ...SECTION 3 OPERATORS FAMILIARIZATION 2252 Operators ...
Page 56: ......
Page 107: ...SECTION 4 OPERATOR CHECKS AND ADJUSTMENTS 2252 Operators ...
Page 108: ......