Operator Checks and Adjustments
Introduction
The checks and adjustments in this section are for the operator and involve
using only controls and adjustments on the outside of the instrument. Internal
adjustments must be made by a qualified service person.
Before operating the instrument for the first time and before connecting the
power, refer to Section 1 Preparation for Use to prepare the instrument for the
initial start-up.
Verify that the POWER switch is OFF (out position). Plug the power cord into a
power-source outlet that supplies a voltage within the operating range of the
instrument’s power supply.
N O T E
If you notice an improper indication or instrument malfunction
during these procedures, refer the instrument to a qualified
service person.
Initial
Setup
The following procedure may be used to set up front-panel controls when the
instrument is first turned on or when a signal is not being applied to the input
connectors.
1. Press in the POWER switch button (ON) and let the instrument warm up
(20 minutes is recommended for maximum accuracy).
2. Set the instrument front-panel controls to obtain a baseline trace:
V ertical C o n tro ls
Vertical MODE
POSITION
VOLTS/DIV
VOLTS/DIV VAR
Channel 1 COUPLING
CH 1
Center the trace
1 V
Calibrated detent
GND
2252 Operators
4-1
Summary of Contents for 2252
Page 17: ...SECTION 1 INTRODUCTION 2252 Operators ...
Page 18: ......
Page 26: ......
Page 27: ...SECTION 2 CONTROLS CONNECTORS AND INDICATORS 2252 Operators ...
Page 28: ... f ...
Page 55: ...SECTION 3 OPERATORS FAMILIARIZATION 2252 Operators ...
Page 56: ......
Page 107: ...SECTION 4 OPERATOR CHECKS AND ADJUSTMENTS 2252 Operators ...
Page 108: ......