Operating Instructions—2213 Service
display size. Center the compressed display w ithin the
graticule area using the Vertical and Horizontal POSITION
controls, then release the BEAM FIND push button.
4. Adjust the TRIGGER LEVEL control, if necessary,
to obtain a stable display.
5. Set the appropriate VO LTS/D IV switch(es) and
readjust the Vertical and Horizontal POSITION controls
to center the display w ithin the graticule area.
6. Set the SEC/DIV switch for the desired number of
cycles of the displayed signal. Then adjust the AUTO
FOCUS control for the best-defined display.
MAGNIFIED-SWEEP DISPLAY
1. Obtain a Signal Display (see preceding instructions).
2.
Adjust the Horizontal POSITION control to move the
trace area that is to be magnified to the center o f the crt
graticule (0.5 division on each side o f the center vertical
graticule line). Change the SEC/DIV switch setting as
required.
3.
Pull out the SEC/DIV Variable knob (X10) to obtain
sweep magnification.
4.
Adjust the Horizontal POSITION control fo r precise
positioning o f the magnified display.
5. To calculate the magnified sweep speed, divide the
SEC/DIV switch setting by 10.
DELAYED-SWEEP DISPLAY
1. Obtain a Signal Display.
2.
Select INTENS HORIZO NTAL MODE and set the
DELAY TIME Range Selector switch to the desired amount
of delay time.
3.
Adjust the AUTO INTENSITY control as needed to
make the intensified zone distinguishable from the
remainder o f the display.
4.
Adjust the D ELAY TIM E M ULTIPLIER control to
move the start of the intensified zone to the start o f the
point of interest on the crt trace. To capture an event
that occurs after the sweep ends, adjust the start o f the
intensified zone past the end o f the sweep.
X-Y DISPLAY
1. Obtain a baseline trace.
2.
Use equal-length coaxial cables, or the tw o 10X
probes supplied w ith the instrument, to apply the hori
zontal signal (X-axis) to the CH 1 OR X input connector
and to apply the vertical signal (Y-axis) to the CH 2 OR Y
input connector.
3.
Select X-Y mode by switching the SEC/DIV switch
to its fu lly counterclockwise position.
4.
Advance the AUTO INTENSITY control setting until
tw o dots are displayed. The display can be positioned
horizontally w ith the Horizontal POSITION control and
vertically w ith the Channel 2 POSITION control.
NOTE
The display obtained when sinusoidal signals are
applied to the X- and Y-axis is called a Lissajous
figure. This display is comm only used to compare
the frequency and phase relationships o f two input
signals. The frequency relationship o f the two input
signals determines the pattern seen. The pattern w ill
be stable only i f a common divisor exists between
the two frequencies.
2-10
Summary of Contents for 2213
Page 1: ...Ttektronix 2213 OSCILLOSCOPE SERVICE IN S T R U C T IO N M A N U A L ...
Page 9: ...2213 Service 3827 01 viii The 2213 Oscilloscope ...
Page 30: ...Theory of Operation 2213 Service 3 3 Figure 3 1 Basic block diagram of the 2213 Oscilloscope ...
Page 67: ...Adjustment Procedure 2213 Service 5 2 ...
Page 139: ...Figure 9 4 2213 block diagram S105 ...
Page 140: ...a o m 7 x C O o z CHANNEL SWITCH AND VERTICAL OUTPUT ...
Page 141: ...2213 Service ...
Page 144: ...2213 ...
Page 146: ...2213 3827 20 R V FB 4982 C 4 ...
Page 147: ...S90I 4 5 ...
Page 148: ...CIRCUIT BOARD INTERCONNECTIONS K tv ra n m CIRCUIT BO ARD IN T E R C O N N E C T IO N S ...
Page 151: ......
Page 153: ...2213 3 K T i RtV D E C ...
Page 154: ......
Page 155: ...2213 Service 1 3 a 7 ...
Page 161: ...2213 Service n 3 a ...
Page 168: ...s RE 2213 ...
Page 169: ... CH 1 CH 2 VERTICAL PREAMPS ...
Page 175: ......
Page 177: ...TRIGGER ...
Page 180: ...fr ...
Page 181: ...f E V AUG I98Z SWEEP GENERATOR LOGIC ...
Page 184: ......
Page 188: ...2 2 1 3 lAlO FWTW m ain b o a rd ...
Page 190: ...i _____H M N XY AMPLIFIER HORIZ OUTPUT ...
Page 191: ...A 1 1 C 1 a i F 1 G 1 H 1 3 4 5 6 7 HO COM TO P 4 C C O 5 S I i S2T 2e R EV Dec I9BI 2 2 3 ...
Page 203: ...2 2 1 3 Service R887 ASTIG R870 GEOM C784 5ns TIMING R860 GRID BIAS ...
Page 207: ... ...
Page 216: ...I ...
Page 217: ...2213 OSCILLOSCOPE ...
Page 218: ......
Page 219: ...2213 OSrs ...
Page 225: ......