background image

 

 

 

VOT 2; Rev 1.2; EN; 09.07.2013  

 

TKT67C 

– Installation and maintenance 

 

 

38

 

APPENDIX 1: Report Layout 

 
Title information 

 

   

 

 

 

         

CENTRAL BATTERY UNIT  01              
00.00.2010 00:00 

 

 

 

CIRC. LUMINAIRE MONITORING  A B C D   mA 

The input current of the circuit                                     

01-Lo OOOO OOOO OO.. ....   _ _ _ _  360  
02-Lo OOOO OOOO OO.. ....   _ _ _ _  380  
03-Lo OOOO OOOO OO.. ....   _ _ _ _  390 
04/Lo .O.. .... .... ....   _ _ _ _  320  
  \Hi ..OO OOOO OO.. ....                

 

05-Lo OOOO OO.. .... ....   _ _ _ _  470 
06-Lo .OOO OO.. .... ....   _ _ _ _  400 
07-Lo OOOO OO.. .... ....   _ _ _ _  430 
08-Lo OOOO OO.. .... ....   _ _ _ _  440 
 

 

CIRC.  CIRCUIT MONITORING   A B C D   mA 
09-P- ...O OOOO OOOO OOOO   _ _ _ _  360  
10-P- ...O OOOO OOOO OOOO   _ _ _ _  380  
11-P- ..OO OOOO OOOO OOOO   _ _ _ _  390  
12-P- .... .OOO OOOO OOOO   _ _ _ _  310 
13-P- OOOO OOOO OOOO OOOO   _ _ _ _  460 
14-P- ..OO OOOO OOOO OOOO   _ _ _ _  390 
15-P- .OOO OOOO OOOO OOOO   _ _ _ _  420 
16-P- .OOO OOOO OOOO OOOO   _ _ _ _  420 
 

Lo = addresses 1-16  
Hi = addresses 17-32 
 
 
 
 
 
 
 
 
P = Circuit monitoring  
 
In circuit monitoring the strength of the current  is 
shown from right to left 
 
                                                                      

 

 

DISCHARGE CURR. 01.20A 

  Current of all circuits in battery use 

BATT. VOLTAGE   249V 

  Voltage of battery on time of printing 

 

 

LUMINAIRE TEST   OK             00.00.00

 

  Result and date of last luminaire test 

BATTERY   TEST   OK     00min   00.00.00 

  Result and date of last battery test 

SYSTEM    TEST   OK 

  Fault in central module, battery or  

charging circuit 

 

 

SETTING 

 

Auto conf        1        A=Local Contr.1 

  Automatic configuration ON 

Test Selection   1/1      B=Overload 

  Test Selection 1/1 = Gap between test dates 

/ selected automatic tests 

Sensitivity      080mA    C=Fuse 

  Current-range of circuit monitoring 

Test Duration    24:00    D=Output Switch 

  Selected time of day for luminaire test 

Connect. Delay   00min    O=OK 

  Selected connection delay from battery use 

to mains use 

Battery Level    210V     #=Faulty 

  Voltage with which automatic battery test  

will be stopped 

Operation time   060min 

  Operation time of the central battery unit 

STATUS           110800emd 

  Status message tells the status of the unit 

 

 

 

 

Symbol explanations: 

 

A= Local Controller Fault  

O = OK 

B= Circuit Overload  

# = fault 

C= Fuse Fault 
D= Output Circuit Fault  

? =Unknown luminaire (added, automatic 
configuration not in use 

 

 = Luminaire not connected 

 

 

 

Summary of Contents for TKT6716C

Page 1: ...VOT2 TKT67C TAPSA CONTROL CENTRAL BATTERY UNIT FOR EMERGENCY LIGHTING Installation and maintenance instructions Made In Finland...

Page 2: ...5 1 Individual luminaire monitoring test with basic settings 11 4 5 2 Circuit monitoring luminaire test with basic settings 11 4 6 Operation of the central battery unit 12 4 7 Normal Status 12 4 8 Ce...

Page 3: ...history 34 8 1 6 Error log 35 8 1 7 Setup 35 8 1 8 External USB connection 36 8 2 Printer 37 8 2 1 Language selection of the printer TKT67 CD or optional feature TST6731 37 8 2 2 Printing out test re...

Page 4: ...ry unit de energized The central battery unit and the battery housing can be opened only by electrically skilled person Device must be made de energized before any maintenance or repair work Remove th...

Page 5: ...Maximum number of circuits Input Voltage TKT6716C N 16 220 240 V AC 50 60Hz 3 TKT6724C N 24 220 240 V AC 50 60Hz 3 TKT6732C N 32 220 240 V AC 50 60Hz 3 TKT6740C N 40 220 240 V AC 50 60Hz 3 TKT6748C N...

Page 6: ...T6757 IC Interface for 56 circuits each 350 W TKT6756C Central monitoring options TST6722 LON Interface TKT67xxC TST6701 BACnet Interface TKT67xxC TST6721 ACM Interface TKT67xxC TST6724 WebCM WebACM I...

Page 7: ...wer supply cables A self learning system luminaires can be added or removed afterwards The central battery unit can be set for either addressable monitoring of the luminaires or for circuit monitoring...

Page 8: ...rcuit Max 11 200VA 1 h 11 200 W 18x65 Ah 3 h 11 200 W 18x65 Ah TKT6740C N 5x 8x350W 4x700W 2x1 400W or 2 5A circuit Max 14 000VA 1 h 14 000 W 18x65 Ah 3 h 14 000 W 18x65 Ah TKT6748C N 6x 8x350W 4x700W...

Page 9: ...0272 2 2001 Safety requirements for secondary battery installations Part 2 Stationary batteries EN 60439 1 A1 2005 Distribution units Part 1 Requirements for type tested and partly type tested units I...

Page 10: ...switch selector that defines the characteristic of the board The functions of the DIP switches are DIPs 1 3 give the board its internal address DIP 4 defines whether the board uses addressable centra...

Page 11: ...gs and 4 11 Buttons 4 5 1 Individual luminaire monitoring test with basic settings As a basic setting the luminaire test is done automatically once a day at a predetermined time The central battery un...

Page 12: ...The menu functions of LEDs 1 and 2 are so called basic functions All other functions are related to the settings of the central battery unit The latter do not need to be changed in normal use When the...

Page 13: ...n Battery fault and Internal fault LEDs are also lit Battery charger is charging batteries with too high voltage Charger is faulty and it must be changed and or Batteries are at the end of their lifet...

Page 14: ...D can be lit with other LEDs that indicate the fault more specifically If the battery is disconnected the charger doesn t charge the battery fuse is blown or the battery doesn t accept charging curren...

Page 15: ...aire is faulty f the LED is not lit no luminaire has been assigned for that address Circuit monitoring The LED bars display the total input power of the circuit If the LED or LEDs are flashing during...

Page 16: ...ue you wish to select shows in the display For example 6 Interrupt the battery test 4 Acknowledge by pressing the MENU OK button again The required action begins 3 SETUP Use this option to enable disa...

Page 17: ...ber of days If the number is 1 the test is made every day or if it is 7 the test is done once a week The number of the second segment determines the settings of the luminaire tests 0 Luminaire and bat...

Page 18: ...e changed all the way up to 150 mA In the display this shows as the value 30 When the value 30 is exceeded the following value is the minimum current the change of which the central battery unit notic...

Page 19: ...ked to a specific central battery unit if there are more than one central battery units in the building To set an individual number for the unit 1 Go to the menu with the MENU OK button 2 Press the BR...

Page 20: ...o set the system time and date 1 Go to the menu with the MENU OK button 2 Press the BROWSE button until the right led is lit 3 Press the SET button until the value you wish to select shows in the disp...

Page 21: ...o action needed unless the test fails If the test fails check condition of batteries To run the battery test yourself either 1 Press the BROWSE button for 8 seconds or 1 Press the MENU OK button 2 Use...

Page 22: ...ctors 68 69 FUSE FAULT If the LED is lit there is a faulty fuse in the control module If the LED is blinking slowly there is a faulty fuse in the circuit shown on the display If the LED is blinking qu...

Page 23: ...aire test Press for 8 seconds to start battery test V METER 1 second until the indicator LED is lit Press and hold SET for 1 second the voltage of the battery is displayed in the LCD display DC A METE...

Page 24: ...the usage of any emergency luminaires operating on AC DC voltage However in case of the fluorescent lamp luminaires they shall be designed so that they switch off when the lamp fails This is because t...

Page 25: ...ed as maintained exit luminaire or Local Controller If you wish to change into non maintained emergency luminaire circuits the Mode link needs to be removed from those circuits Layout for Mode links i...

Page 26: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 26 5 2 1 Parts layout...

Page 27: ...onnection wiring for circuit board 1 1 400 W 4 circuits combined parallel connection wiring for circuit board 1 Note If you are using parallel connections please note that all output circuits in same...

Page 28: ...ircuit board operates according to the addressable luminaire monitoring principle When the DIP switch number 4 is in the ON position the circuit board operates according to the circuit monitoring prin...

Page 29: ...capacity The charging current has been set to minimum at the factory The battery type and capacity must be set checked as follows 1 Set the battery type and capacity with the recharge control unit DI...

Page 30: ...s flashing Checking luminaire circuits on at a time is running As the checking process progresses the LEDs will show the luminaires found in the circuit or the total input power of the circuit Once th...

Page 31: ...required for the central battery unit other than changing the batteries when the specified emergency mode duration is no longer achieved The luminaires need to have their light sources replaced once...

Page 32: ...central battery unit depending on the model You can either select a central battery unit that already includes the option or select the option as an added feature depending on the model The options ar...

Page 33: ...s Figure 2 LCD after having received configuration data from the central battery system 8 1 3 LCD menu tree When you press the SETUP button the LCD menu tree is displayed You can browse the menu by pr...

Page 34: ...er board first select the board using the buttons then confirm your selection by pressing the SETUP button To move back to the higher level menu from the test log press the SETUP button for 1 5 s You...

Page 35: ...test log press the SETUP button 8 1 7 Setup You can change the settings and start tests by first selecting the desired function using the buttons and then confirming your selection by pressing the SE...

Page 36: ...llowing display is shown Figure 11 USB cable connected The LCD software will scan the USB ports opening a connection A new row will appear on the display informing you that a connection has been opene...

Page 37: ...ter TKT67 CD or optional feature TST6731 It is a possible to switch the language of the printing with the DIP switches of the TST3004 unit The TST3004 contains the pre programmed languages English Fin...

Page 38: ...DISCHARGE CURR 01 20A Current of all circuits in battery use BATT VOLTAGE 249V Voltage of battery on time of printing LUMINAIRE TEST OK 00 00 00 Result and date of last luminaire test BATTERY TEST OK...

Page 39: ...matically reset when the fuse has been replaced with a new one The condition of the output circuits is checked only before the tests The circuit voltages are checked at this time with an open and clos...

Page 40: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 40 APPENDIX 3 Connection alternatives for batteries...

Page 41: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 41 APPENDIX 4 Circuit diagram with 3 phase input...

Page 42: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 42...

Page 43: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 43...

Page 44: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 44...

Page 45: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 45...

Page 46: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 46...

Page 47: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 47...

Page 48: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 48...

Page 49: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 49...

Page 50: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 50...

Page 51: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 51...

Page 52: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 52...

Page 53: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 53...

Page 54: ...re test automatically battery test manually luminaire test manually battery test automatically 6 Sensitivity 7 Luminaire test time 8 Delay time 9 Cent Number 10 Battery level 11 Duration 12 Years 13 M...

Page 55: ...VOT 2 Rev 1 2 EN 09 07 2013 TKT67C Installation and maintenance 55...

Page 56: ...t teknoware fi www teknoware fi Emergency lighting unit Telephone Email emexit teknoware fi Export Manager Mr Simo Kurki 358 0 3 883 178 simo kurki teknoware fi Area Manager Mr Pasi Hongisto 358 0 3 8...

Reviews: