10 TEGAM WAY • GENEVA, OHIO 44041 • 440-466-6100 • FAX 440-466-6110
•
4-11
MAINTENANCE
After trouble-shooting and repair, the instrument must be
recalibrated in accordance with 4.5 above.
4.7
Preparation for Shipment
The original shipping carton is not reusable.
The unit should be repackaged in a humidity-sealed carton
in accordance with MIL-P-116J, which is the specification
governing covering and preservation used in the initial
shipment from the manufacturer.
The Model R1L-D1 is a rugged instrument and requires no
special covering, preservation or special cradles. Packaging
must provide sufficient resilient material, in accordance with
standard packaging practices, to prevent excessive shock to
the power supply and display during shipment.
4.8
Overhaul Instructions
The Model R1L-D1 is an all solid-state unit and requires no
periodic overhaul, other than routine cleaning and
inspection, as listed in Sections 4.1 and 4.2 and circuit
calibration, described under Section 4.5 above.
However, some disassembly is required to remove and to
install the battery. Disassembly instructions may be found
under Sections 2 and 4.6 above. Re-assembly instructions
are listed in Section 4.6 as well.
Tools required are listed in Section 1.6 and test equipment
required is listed in Section 4.3.
Trouble-shooting is listed in Section 4.6.
The only component expected to require replacement is the
battery. Battery designation is listed in the Replacement
Parts List, and installation instructions are listed in Section
2.1.