10 TEGAM WAY • GENEVA, OHIO 44041 • 440-466-6100 • FAX 440-466-6110
•
2-1
PREPARATION FOR USE AND INSTALLATION
SECTION 2
PREPARATION FOR USE AND INSTALLATION
2.1 Unpacking and Inspection
Upon receipt, the R1L-D1 should be carefully unpacked and
removed from the shipping container. Separate the units
from the packing material and inspect both the instrument
and the accessory kit for any external damage.
•
If any dents, broken, or loose parts are seen, do not use
the equipment. Notify TEGAM immediately.
2.2
Preparation for Use
•
Release the two latches which secure the lid of the Model
R1L-D1, and open the lid. Since the lid is well gasketed,
it may be difficult to open if there is an appreciable
difference between internal and external air pressure.
•
Note that the instrument is shipped with its battery
removed. Unwrap the five NiCad C-cells which comprise
the battery.
•
Inspect the MAINS power entry module and make sure
that it indicates the proper voltage for the MAINS to be
used (120 or 240 VAC).
MAINS Setup
If the mains voltage is not correct, proceed as follows:
a.
Pry the top of the MAINS cover open by inserting a flat
bladed tool at the top of the module just down from the
mains terminals.
b.
Remove the fuse assembly and replace the fuse with the
correct one.
For 115 VAC operation: FU-203; Bussman AGC 0.5 A /
Littelfuse 0312.500 (Fast Blow)
For 230 VAC operation: FU-1804-2; Bussman GDC 0.25 A
/ Littelfuse 0218.250 (Slow Blow)
The single 1/4"x1.25" 0.5 A 120 V fuse goes on one side