T
EE
J
ET
5000
O
PERATORS MANUAL
S
EED DRILL
,
S
IMBA
5.65
TRAMLINE CONTROL
The primary function for seed drills is the track number. The following picture is
displayed:
Bout number Track number
The bout number is the present bout being driven in the field (counts 1 each time
the drill is lifted). The track number is what has been encoded (see
“ENCODE”
).
The TeeJet 5000 has 2 different methods of controlling the tramlines (
A
and
B
).
The method is selected under
“ENCODE”
:
METHOD A
This method is a new and logical method of making tramlines.
If the tramlines are to be made on uneven bouts (3,5,7, or 9) then the tramlines will
always
be made in the middle bout. Two clutches are fitted to the middle of the
drill. See the drawing for
METHOD A UNEVEN
.
If the tramlines are to be made on even bouts (2,4,6, or 8), then the tramlines are
split between the 2 middle bouts. The field must be sown up and down as there is
only 1 clutch fitted on one side of the seed drill. See the drawing for
METHOD A
EVEN
.
The tramlines are displayed for this method thus:
METHOD B
This method is older and better known. Tramlines are made when the present bout
is the same as the track number. The operator must know how the field has been
started.
If tramlining is required in on uneven bouts (3,5,7, or 9) the system works well.
Tramlines are made, using 2 clutches fitted in the middle of the seed drill, when
the present bout number is the same as the encoded track number. See the
drawing
METHOD B UNEVEN
.
If the tramlines are to be made on even bouts (2,4,6, or 8), then the operator must
drive around the field with only one half of the seed drill open. This is necessary,
as the tramlines cannot be split over 2 bouts. The clutches are fitted in the middle
of the seed drill, and the tramlines are made in one bout. See the drawing
METHOD B EVEN
.
Summary of Contents for 5000
Page 56: ...SPRAYER TEEJET 5000 OPERATORS MANUAL 3 14 ...
Page 58: ......
Page 80: ...FERTILISER DISTRIBUTOR OTHER TYPE WITH REG TEEJET 5000 OPERATORS MANUAL 4 22 ...
Page 92: ...FERTILISER DISTRIBUTOR BØGBALLE TEEJET 5000 OPERATORS MANUAL 4 34 ...
Page 118: ...FERTILISER DISTRIBUTOR BREDAL HYDR B TEEJET 5000 OPERATORS MANUAL 4 60 ...
Page 132: ...FERTILISER DISTRIBUTOR BREDAL HYDR K TEEJET 5000 OPERATORS MANUAL 4 74 ...
Page 146: ...FERTILISER DISTRIBUTOR BREDAL K RAMP TEEJET 5000 OPERATORS MANUAL 4 88 ...
Page 182: ...FERTILISER DISTRIBUTOR RAUCH AXERA H TEEJET 5000 OPERATORS MANUAL 4 124 ...
Page 194: ......
Page 253: ...TEEJET 5000 OPERATORS MANUAL SEED DRILL LEMKEN 5 59 ...
Page 254: ...SEED DRILL LEMKEN TEEJET 5000 OPERATORS MANUAL 5 60 ...
Page 276: ...BALER TEEJET 5000 OPERATORS MANUAL 6 8 ...
Page 278: ......
Page 291: ...TEEJET 5000 OPERATORS MANUAL SLURRY SPREADER OTHER TYPE 7 13 ...
Page 292: ...SLURRY SPREADER OTHER TYPE TEEJET 5000 OPERATORS MANUAL 7 14 ...
Page 350: ...FITTING INSTRUCTIONS TEEJET 5000 OPERATORS MANUAL 12 2 ...
Page 352: ...FITTING INSTRUCTIONS TEEJET 5000 OPERATORS MANUAL 12 4 GENERAL OVERVIEW ...
Page 365: ...TEEJET 5000 OPERATORS MANUAL FITTING INSTRUCTIONS 12 17 ...