![TECO F510 series Quick Setting Manual Download Page 50](http://html1.mh-extra.com/html/teco/f510-series/f510-series_quick-setting-manual_1072458050.webp)
49
LED display
Possible solutions
Communication
Error
Replace the control board
CF01
Operator
Communication
Error 2
Disconnect the operator and
then reconnect.
Replace the control board
CT Fault
Check input voltage signal
and the voltage on the
control board.
Double
Communication
Error
Check only one
communication mechanism
is used.
PTC Signal
Loss
Check if MT terminal and
GND terminal are connected.
OPR
Disconnection
Check if the operator is
disconnected or removed.
FBLSS
PID Feedback
Signal Loss
Check if the proportion of
loss pressure (23-19) is set
correctly.
Make sure the feedback
sensor is installed correctly
and PID feedback signal
operates normally.
SC
Short Circuit
Check if the load is at correct
wiring.
PF
Protection Fault
Remove run command in
multi-function digital input
terminals.
TOL
External
Overload
Check external overload.
Reset external overload of
digital input.
4.3 Warning / Self-diagnosis
Detection Function
When the inverter detects a warning, the
keypad displays a warning code (flash).
Note:
The fault contact output does not
energize on a warning and the inverter
continues operation. When the warning is no
longer active the keypad will return to its
original state.
When the inverter detected a programming
error (for example two parameters contradict
each other of are set to an invalid setting),
the keypad displays a self-diagnostics code.
Note:
The fault contact output does not
energize on a self-diagnostics error. While a
self-diagnostics code is active the inverter
does not accept a run command until the
programming error is corrected.
Note:
When a warning or self- diagnostic
error is active the warning or error code will
flash on the keypad.
Refer to Table 4.2 for and overview, cause
and corrective action for inverter warnings
and self-diagnostic errors.
Table 4.2 warning / self-diagnosis and
corrective actions
LED display
Possible solutions
OV
(flash)
Over voltage
Increase deceleration time
Reduce input voltage to
comply with the input
voltage requirements or
install an AC line reactor
to lower the input voltage.
Remove the power factor
correction capacitor.
Use dynamic braking unit.
Replace braking transistor
or resistor.
Adjust speed search
parameters.
UV
(flash)
under voltage
Check the input voltage.
Check input wiring.
Check power source
Replace magnetic
contactor
Replace control board or
complete inverter.
OH1
Heat sink
overheating
Check the ambient
temperature of the
inverter.
Check the fan or dust and
dirt in the heat sink.
Check the carrier
frequency setting.
OH2
(flash)
Inverter over
heating warning
Multi-function input
function set incorrectly.
Check wiring
OT
(flash)
over torque
detection
Check over torque
detection parameters (08-
15 / 08-16).
Check and reduce motor
load, check and operation
duty cycle.
Summary of Contents for F510 series
Page 1: ......
Page 56: ...2 1 4 1 5 08 30 07 00 5 5 20Hp 15 1 6 25 10 40 60 95 RH...
Page 57: ...3 2 2 1 NFB AC NFB NFB NFB 200mA 0 1 V TYPE AC AC EMC R S T E...
Page 58: ...4 2 2 F510 F510 2 1 2 2 2 3...
Page 100: ......