![Technoton DUT-E S7 Operation Manual Download Page 29](http://html.mh-extra.com/html/technoton/dut-e-s7/dut-e-s7_operation-manual_1070695029.webp)
DUT-E S7 installation / Wireless transfer of sensor indications to the Android device / Calibration of the measuring system
DUT-E S7 fuel level sensor. Operation manual. Version 4.0
©
Technoton, 2021
29
4)
To calibrate minimum (lowest) point of level measurement, press
button
in
Sensor calibration
bar.
ATTENTION:
When the measuring system calibrating to minimum level, there should
not be fuel residues on surface of tubes of probe.
5)
Dip the
probe’s tubes fully into the fuel.
Wait for (10
…
20) seconds for sensor readings
stabilization.
6)
To calibrate maximum (highest) point of level measurement, press
button in
Sensor calibration
bar.
7)
Save the changes of the profile in the memory of the Android device.
8)
Measuring system calibration is finished.
IMPORTANT:
If frequency values of the sensor measuring generator for the
maximum and minimum fuel levels are known, it is sufficient to enter these values in
the fields
Frequency “Empty”
and
Frequency “Full”
of
Sensor calibration
bar
respectively, instead of the calibration operation (see figure 13).