ENGLISH
20
PHASE 2 : FIRST PREHEATING (HEATING 1)
When
EV4
is closed, the preheating phase with the working of the heating element
(positioned around the chamber) starts.
EV2
EV3
EV4
EV5
EV6
EV7
OFF
OFF
OFF
ON
OFF
OFF
The produced heat generates steam production inside the chamber, with conseguent raise of
the pressure, up to the value of + 0.3 bar.
Summary of Contents for ONYX B 5.0
Page 2: ......
Page 11: ...ITALIANO 11 ONYX 8 0 EV5 EV3 EV7 EV4 EV2 EV6 FLOWMETER PRESSURE TRANSDUCER...
Page 16: ...ITALIANO 16 COLLEGAMENTO BASE...
Page 17: ...ITALIANO 17 COLLEGAMENTO CON OSMOSI COLLEGAMENTO CON SISTEMA OSMOSI CENTRALIZZATO...
Page 71: ...ITALIANO 71 MAIN BOARD...
Page 72: ...ITALIANO 72 REFERENCE TYPE CONNECTOR PIN NUMBERS N SIGNAL NAME...
Page 76: ...ITALIANO 76 USER BOARD...
Page 88: ...ENGLISH 11 ONYX 8 0 EV5 EV3 EV7 EV4 EV2 EV6 FLOWMETER PRESSURE TRANSDUCER...
Page 93: ...ENGLISH 16 BASIC CONNECTION...
Page 94: ...ENGLISH 17 PURA PLUS OSMOSIS SYSTEM INTALLATION CENTRALIZED OSMOSIS SYSTEM INTALLATION...
Page 148: ...ENGLISH 71 B ELECTRIC AND CONNECTION DIAGRAM...
Page 149: ...ENGLISH 72 MAIN BOARD...
Page 153: ...ENGLISH 76 USER BOARD...
Page 165: ...ESPA OL 11 ONYX 8 0 EV5 EV3 EV7 EV4 EV2 EV6 FLOWMETER PRESSURE TRANSDUCER...
Page 170: ...ESPA OL 16 INSTALACI N B SICA...
Page 171: ...ESPA OL 17 INSTALACI N CON EL SISTEMA DE SMOSIS INSTALACI N CON SISTEMA DE SMOSIS CENTRALIZADO...
Page 225: ...ESPA OL 71 B ESQUEMA EL CTRICO Y CONEXIONES...
Page 226: ...ESPA OL 72 MAIN BOARD...
Page 230: ...ESPA OL 76 USER BOARD...
Page 234: ......