ENGLISH
39
PT1000 CALIBRATION
In order to calibrate the PT1000 follow procedure
P12
PARAMETER OFFSET
To run the parameter offset follow procedure
P20
SERVICE TEST CYCLE
Runs a reduced operating cycle (with a vacuum stage) to
quickly test the autoclave operation.
EV RUNNING TEST
Runs an automatic control test on the operation of all the
electrovalves fitted in the machine.
The display features the list of the electrovalves controlled in sequence with the test
result alongside each of them. In this message is displayed the test on the
electrovalve has been successful; if this message is displayed the test on the
electrovalve has failed. In the event of the second signal, the authorised technician must
work on the faulty electrovalve. At the end of the test the display shows “ Press a key to
continue! ”, press one of the three keys to exit the test menu and go back to the main
menu.
LOGGING MODE
Gives the option to select the mode:
NORMAL
: to store the data for the cycle in progress every
30s.
DEBUG
: to store the data for the cycle in progress every
10s.
MAGNETE TEST
Press to start the safety magnet test which locks the
door (without starting the cycle). Press
Unlock
to go back
to the main screen.
MANTAINANCE NOTICE
Once the maintenance is completed it inhibits the
notification at intervals of 800 cycles
EXIT
Allows going back to the operating screen.
At the end of the technical intervention, we
recommend switching off the machine to completely
exit the technical menu
v
x
v
Summary of Contents for ONYX B 5.0
Page 2: ......
Page 11: ...ITALIANO 11 ONYX 8 0 EV5 EV3 EV7 EV4 EV2 EV6 FLOWMETER PRESSURE TRANSDUCER...
Page 16: ...ITALIANO 16 COLLEGAMENTO BASE...
Page 17: ...ITALIANO 17 COLLEGAMENTO CON OSMOSI COLLEGAMENTO CON SISTEMA OSMOSI CENTRALIZZATO...
Page 71: ...ITALIANO 71 MAIN BOARD...
Page 72: ...ITALIANO 72 REFERENCE TYPE CONNECTOR PIN NUMBERS N SIGNAL NAME...
Page 76: ...ITALIANO 76 USER BOARD...
Page 88: ...ENGLISH 11 ONYX 8 0 EV5 EV3 EV7 EV4 EV2 EV6 FLOWMETER PRESSURE TRANSDUCER...
Page 93: ...ENGLISH 16 BASIC CONNECTION...
Page 94: ...ENGLISH 17 PURA PLUS OSMOSIS SYSTEM INTALLATION CENTRALIZED OSMOSIS SYSTEM INTALLATION...
Page 148: ...ENGLISH 71 B ELECTRIC AND CONNECTION DIAGRAM...
Page 149: ...ENGLISH 72 MAIN BOARD...
Page 153: ...ENGLISH 76 USER BOARD...
Page 165: ...ESPA OL 11 ONYX 8 0 EV5 EV3 EV7 EV4 EV2 EV6 FLOWMETER PRESSURE TRANSDUCER...
Page 170: ...ESPA OL 16 INSTALACI N B SICA...
Page 171: ...ESPA OL 17 INSTALACI N CON EL SISTEMA DE SMOSIS INSTALACI N CON SISTEMA DE SMOSIS CENTRALIZADO...
Page 225: ...ESPA OL 71 B ESQUEMA EL CTRICO Y CONEXIONES...
Page 226: ...ESPA OL 72 MAIN BOARD...
Page 230: ...ESPA OL 76 USER BOARD...
Page 234: ......