30
SAFETY GOGGLES AND GLOVES MUST BE WORN AT ALL TIMES WHEN YOU
ARE SETTING UP OR CLEANING THE UV COATER.
READ AND UNDERSTAND THE SAFETY DATA SHEET FOR THE UV COATING.
1)
Open UV Coating compartment door.
2)
Connect the brass fitting hose to the
blue or orange tubing. Make sure the
fitting is secure.
Open the fluid pump head and insert
the black hose as shown.
Orange tubing p/n
TBG-034
Blue tubing p/n
TBG-035
3)
Make sure the tubing is properly set
inside the pump head locking jaws.
Black tubing p/n
TBG-049
SECTION 11.0 UV COATING SET-UP