![TEC Infra-red STERLING Owner'S Manual Download Page 8](http://html2.mh-extra.com/html/tec-infra-red/sterling/sterling_owners-manual_4025904008.webp)
7
Cabinet Base (Sterling II and III)
1. Remove the Cabinet Base from the packaging
materials and set it on a level surface.
2. Place the Grill Housing on the Cabinet Base and
align the round mounting holes in the Base with the
threaded inserts in the Housing.
3. Fasten the Housing to the Base with the supplied
hardware. (Hardware needed: Four (4) each
1
/
4
-20 x
1
/
2
"L hex head bolts and flat washers.) (See Figure 6.)
Figure 6.
Cabinet Base
Roll Back Hood (Sterling II and III)
1. Remove the Roll Back Hood from the packaging
materials.
2. Remove the Heat Shield from the Grill Housing.
(See Figure 7.)
3. Set the Hood in place on the Grill Housing.
4. Fasten the Hood to the Grill Housing with the
supplied hardware. (Hardware needed: Four (4) each
#10-24 x
1
/
2
"L screws and nuts.) (See Figure 8.)
5. Replace the Heat Shield.
Cooking Grids and Baking Rack
(Sterling II and III)
1. Remove the Cooking Grids and Baking Rack from
the packaging materials.
2. Set the Cooking Grids in place with the open side of
the channels facing up and the holes toward the rear
of the grill. Set the Baking Rack in place inside the
Roll Back Hood.
Assembly
continued
1/4 - 20 HEX. BOLT
W/ FLAT WASHER
(TYP. BOTH ENDS)
10-24 SCREW
W/ #10 KEP NUT
(TYP. BOTH ENDS)
HEAT SHIELD
Figure 7.
Heat Shield
Figure 8.
Roll Back Hood