![TEC Infra-red STERLING Owner'S Manual Download Page 19](http://html2.mh-extra.com/html/tec-infra-red/sterling/sterling_owners-manual_4025904019.webp)
18
Appendix A: Sterling Build-in Specifications
NOTES
*
Space must be left below unit to run and store gas line and shut-off valve.
■
The carriage bolts (8 places) located on both sides of the grill must be removed to install the grill properly.
■
TEC recommends that the insulated sleeve be on-site prior to construction of fixture.
■
Using these dimensions there should be an approximate trim overhang of 7/16" on all sides.
■
All units should be sealed between the grill and the insulated sleeve (6 sides) with clear or gray silicone caulk (350° F maximum
temperature).
■
If shims are required to square the unit up, place the shims between the spacer channel located on the sides of the insulated sleeve
and the walls of the build-in structure.
Revised 08/04
18
FRONT VIEW
TOP VIEW