CSP INSTALLATION
Figure 9
Uncrating
The press, monitor, leveling feet, casters, and other removed parts are shipped on one pallet, which is
shrink- wrapped for protection. Remove the shrink-wrap and unpack the monitor and other shipped parts.
Remove Press from pallet by unbolting hold-down bolts on four legs and lifting up with a forklift or hoist.
Put the fork lift legs underneath either side of the head assembly. See arrows above in Figure 9. The fork
lift legs should be wrapped with plastic or wood in hopes to not harm the back windows of the machine.
NOTE
Lift from bottom of structure. Keep forks spread as wide as possible for better stability.
Initial Assembly
1. Using the four supplied Foot Levelers (PN 2256590-1), install the four Levelers to bottom of Press and
adjust X / Y axis of table top
level with a ‘bubble’
gauge.
2. Install four supplied casters (PN 2256386-1) to bottom of frame.
3. Install customer-supplied 3-conductor power cord appropriate for the available voltage and current
capacity (200-240VAC, single phase, 6A) on back of CSP.
4. Route customer supplied 3-conductor power cord through the strain relief on the side of the Press.
Connect ground conductor
to stud marked “PE” on the side of the Press frame. Connect line
conductors to Master Power Switch terminals.
5. Install customer-
supplied industrial airline to ‘Quick Disconnect’ on
lower panel of machine. Air at
80PSI is required for pneumatic shuttle.
6. Install monitor on the shelf. Reinstall monitor power cord and monitor video cable.
7. Place keyboard and mouse in keyboard tray and connect to the UI computer on the electrical panel.
8. Connect Barcode Reader (if supplied).
9. DO NOT remove press head lockdown brackets.
10. Power up Press by turning on Master Power Switch. The system will boot to the home screen. The
default username
Administrator
has a default password of
administrator
.
NOTE
Administrator (Customer / Owner) should change the initial login password to secure the machine from unauthorized access.