Rev.
Engineering Dept,China Manufacturing Center,TCL Multimedia
NO
Q'ty
A
1
B
1
C
1
D
Q'ty
E
1
F
G
H
NO.
1
2
12s
3.The processes is operated on a strict self-test, to prevent defective products into the next process.
4.When taking the mainboard,operator must do gently to avoid crashing or knocking the components.
Prepared
:
Bin Tang Checked by
:
Approved by
:
S.T Total:
PRECAUTIONS
1.The real goods used above items must be the same as BOM list's goods.
2.Operator should wear Gloves when operating.
PROCESS DESCRIPTION
Oper.Parameter
Take mainboard on the workpalce.
Assemble the AV bracket across the mainboard.
Name
Pair of Electrostatic Gloves
Ass'y No.
H7-KD270NZG-UR0
Section
CTV ASSEMBLY
56-737730-JHN6R
AV bracket
Oper. Name
Process 1 of boards
Remark
56-737740-KHN6R
FIXTURES & INSTRUMENTS
OS-C000390.00
Issue Date
:
2015/11/13
Model
40D2700B MS08BP-AP
NO.
1/23
T8-40APZG-MA7
Customer
1.0
Modified Date
:
Specification
mainboard
Electrostatic Mark
WORK INSTRUCTION
File No.
:
Part Number
Description
mainboard
AV bracket
Attentions: When you fold
the side AV bracket, pay
attention to the intensity and
don't fold several times, or it
would happen easily pale,
deformed, broken and other
adverse
Here's some
uoches into
place