Rev.
Engineering Dept,China Manufacturing Center,TCL Multimedia
NO
Q'ty
A
1
B
C
D
Q'ty
E
2
F
G
H
NO.
1
2
3
18s
OS-C000390.00
Issue Date
:
2015/11/13
1.0
Modified Date
:
Remark
Electrostatic Mark
WORK INSTRUCTION
File No.
:
Part Number
Description
Specification
Model
40D2700B MS08BP-AP
NO.
21/23
74-106072-3WDEM
Customer
Oper. Name
Packing 2 of TV sets
Ass'y No.
H7-KD270NZG-UR0
Section
CTV ASSEMBLY
FIXTURES & INSTRUMENTS
Name
Pair of Cotton Gloves
PROCESS DESCRIPTION
Oper.Parameter
Operators lift the machine with the hand on the flat, check the appearance of the machine a
the top.
Fold plastic mouth,then lift machines into carton.
Ployfoam arrow unified in one direction, and the side of the screen with the arrow facing
ployfoam place, we must not put the other direction.
Prepared
:
Bin Tang Checked by
:
Approved by
:
bag
S.T Total:
PRECAUTIONS
1.The real goods used above items must be the same as BOM list's goods.
2.The processes is operated on a strict self-test, to prevent defective products into the next process.
Fig.1
Fig.
Fig.
Fig.
Fig.5
Lift the machine, you need
to pull the body above the
edge of the machine
handing on flat
Open the plastic
mouth , and check the
top of the machine
from looking in the
Finish and smooth
plastic bags, plastic
bags must be checked
no significant
Fold the excess
plastic mouth
Lift TV inverted into the
Precautions:The operators
at the station should refer to
the next process (Packing 2
of TV sets )
The Top
The Bottom
Images are only for reference :
When production ,prevail with
art materials , ODF information
and the real product of the
batch.