Rev.
Engineering Dept,China Manufacturing Center,TCL Multimedia
NO
Q'ty
A
1
B
C
D
Q'ty
E
1
F
G
H
NO.
1
2
14s
3.The processes is operated on a strict self-test, to prevent defective products into the next process.
Prepared
:
Bin Tang Checked by
:
Approved by
:
S.T Total:
PRECAUTIONS
1.The real goods used above items must be the same as BOM list's goods.
2.Operator should wear Gloves when operating.
PROCESS DESCRIPTION
Oper.Parameter
Plug and stick the LVDS wire and LB wire as fig.1.
Fix the small back cover on the module as fig.1.
Name
Pair of Electrostatic Gloves
FIXTURES & INSTRUMENTS
Ass'y No.
H7-KD270NZG-UR0
Section
CTV ASSEMBLY
Description
Specification
Model
40D2700B MS08BP-AP
NO.
11/23
89-BX8915-JZ0U
fiber tape with 80mm
Customer
Oper. Name
Fix the rear cabinet
Remark
Electrostatic Mark
WORK INSTRUCTION
Part Number
File No.
:
OS-C000390.00
Issue Date
:
2015/11/13
1.0
Modified Date
:
Fig.1
Fiber tape is affixed to "Ω" (ohms)
shape, pull the smallest gap
between the wire and cable, so tape
is not easy to loose
small back cover
subassembly
lvds wire
fiber tape
LB wire