OPERATING PROCEDURES
6-5
085592-M
Operating Procedures
6
20. Install the drip pan.
Figure 6-16
Sanitizing
1. Prepare an approved 100 PPM sanitizing solution
(examples: 2.5 gal. [9.5 L] of Kay-5
®
or 2 gal. [7.6 L]
of Stera-Sheen
®
).
Use warm water and follow the
manufacturer's specifications
.
2. Pour 1 gal. (3.8 L) of sanitizing solution into the
hopper and allow it to flow into the freezing cylinder.
Figure 6-17
3. While the solution is flowing into the freezing cylinder,
brush clean the mix hopper, the mix inlet hole, and
the feed tube.
Figure 6-18
Figure 6-19
4. Place the power switch in the ON position.
Figure 6-20
12029
12235
12019
13093
131559
Summary of Contents for C152
Page 8: ...1 4 TO THE INSTALLER 085592 M To the Installer 1 Notes ...
Page 36: ...9 2 PARTS REPLACEMENT SCHEDULE 085592 M Parts Replacement Schedule 9 Notes ...
Page 40: ...10 4 LIMITED WARRANTY ON EQUIPMENT 085592 M Limited Warranty on 10 Notes ...
Page 44: ...11 4 LIMITED WARRANTY ON PARTS 085592 M Limited Warranty on Parts 11 Notes ...